X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0756052510003

Well Details

Well ID: 0756052510003
Loading map...
Location: 00/10-25-075-05W6/3
Location Alias: 00/10-25-75-05 W6M
Location Alias 2: 00/10-25-075-05 W6/03
Country: Canada
Province: Alberta
Township: 075
Meridian: 6
Range: 05
Section: 25
County/Municipality: Saddle Hills County
Well Name: RANGER WOKING 10-25MU-75-5
Operator Name: Canadian Natural Resources Limited
License Number: 0015135
License Date: 1958-05-02
License Status: Abandoned
Spud Date: 1958-05-21
Final Drill Date: 1958-06-18
Well Total Depth: 2058.30 m
Surface Hole Latitude: 55.528727
Surface Hole Longitude: -118.630761

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-05-02 Obtained License
1958-06-05 Drill Stem Test Performed
1958-06-13 Drill Stem Test Performed
1958-06-18 Finished Drilling
1958-06-18 Well Mode changed to Drilled and Cased
1958-06-19 Drill Stem Test Performed
1958-06-20 Drill Stem Test Performed
1958-06-22 Drill Stem Test Performed
1958-06-24 Production Casing Operation Performed
1958-06-26 Perforation Treatment Performed - Jet Perforation
1958-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-06-27 Perforation Treatment Performed - Fractured
1958-06-30 Perforation Treatment Performed - Cement Squeeze
1958-07-03 Perforation Treatment Performed - Jet Perforation
1958-07-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-07-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1958-07-06 Perforation Treatment Performed - Jet Perforation
1958-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-07-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1958-07-09 Perforation Treatment Performed - Jet Perforation
1958-07-10 Perforation Treatment Performed - Fractured
1958-07-14 Perforation Treatment Performed - Jet Perforation
1967-10-05 Perforation Treatment Performed - Jet Perforation
1980-05-04 Perforation Treatment Performed - Cement Squeeze
1980-05-10 Perforation Treatment Performed - Cement Squeeze
1980-05-23 Perforation Treatment Performed - Jet Perforation
1991-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-10-28 Plug Back Performed
1991-10-29 Perforation Treatment Performed - Jet Perforation
1991-10-29 Well Log Performed
1991-11-01 Well Began Production
1991-11-01 Well Fluid changed to Gas
1991-11-01 Well Mode changed to Flowing
1999-04-08 Well Fluid changed to Gas
1999-04-08 Well Mode changed to Suspended
2000-07-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-06 Perforation Treatment Performed - Jet Perforation
2000-07-06 Perforation Treatment Performed - Remedial Casing
2000-07-06 Plug Back Performed
2000-07-07 Perforation Treatment Performed - Cement Plug
2000-07-10 Well Abandoned
2000-07-10 Well Fluid changed to Gas
2000-07-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-06-26 Perforation 1618.20 1620.00 7
1958-07-06 Perforation 1620.00 1621.20 13
1958-07-09 Perforation 1620.00 1621.20 13
1958-07-09 Packing Device Capped w/Cement 1621.50 1621.50 0
1958-07-09 Acid Treatment 1620.00 1621.20 0
1958-07-10 Fracture 1620.00 1621.20 0
1958-07-14 Perforation 1405.40 1408.50 0
1967-10-05 Perforation 1022.90 1026.00 7
1980-05-04 Cement Squeeze 1022.90 1026.00 0
1980-05-10 Cement Squeeze 1405.40 1408.50 0
1980-05-23 Perforation 1407.50 1408.10 7
1958-06-26 Perforation 1620.90 1622.80 7
1991-10-28 Packing Device Capped w/Cement 1392.00 1400.00 0
1991-10-28 Packing Device Capped w/Cement 1341.00 1349.00 0
1991-10-29 Perforation 1013.00 1015.00 13
2000-07-06 Packing Device Capped w/Cement 1013.00 1021.00 0
2000-07-06 Packing Device Capped w/Cement 999.00 1007.00 0
2000-07-06 Perforation 225.00 226.00 18
2000-07-06 Remedial Casing Cementing 225.00 226.00 0
2000-07-07 Cement Plug 126.90 241.00 0
1958-06-26 Perforation 1624.60 1627.60 7
1958-06-27 Acid Treatment 1618.20 1627.60 0
1958-06-27 Fracture 1618.20 1627.60 0
1958-06-30 Cement Squeeze 1618.20 1627.60 0
1958-07-03 Perforation 1691.60 1694.70 13
1958-07-04 Acid Treatment 1691.60 1694.70 0
1958-07-06 Packing Device Capped w/Cement 1677.60 1677.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 1438 0.0 0.0 0.0
1992 6194 0.0 0.0 0.0
1993 3623 0.0 0.0 0.0
1994 7336 0.0 0.0 0.0
1995 7509 0.0 0.0 0.0
1996 8585 0.0 0.0 0.0
1997 7880 0.0 0.0 0.0
1998 1914 0.0 0.0 0.0

For data sources see[5]

References