If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0746082611000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.44216,"lon":-119.120685,"icon":""}]} |
Location: 00/11-26-074-08W6/0 | |
Location Alias: 00/11-26-74-08 W6M | |
Location Alias 2: 00/11-26-074-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 074 | |
Meridian: 6 | |
Range: 08 | |
Section: 26 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: AMOCO LA GLACE 11-26-74-8 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0078641 | |
License Date: 1979-10-16 | |
License Status: RecCertified | |
Spud Date: 1979-10-18 | |
Final Drill Date: 1979-11-23 | |
Well Total Depth: 2570.00 m | |
Surface Hole Latitude: 55.442160 | |
Surface Hole Longitude: -119.120685 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-10-16 | Obtained License |
1979-11-23 | Finished Drilling |
1979-11-25 | Well Log Performed |
1979-11-27 | Drill Stem Test Performed |
1979-11-28 | Drill Stem Test Performed |
1979-11-29 | Drill Stem Test Performed |
1979-12-02 | Production Casing Operation Performed |
1979-12-02 | Well Mode changed to Drilled and Cased |
1980-01-16 | Perforation Treatment Performed - Jet Perforation |
1980-01-17 | Perforation Treatment Performed - Fractured |
1980-02-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-02-24 | Perforation Treatment Performed - Nitrogen Treatment |
1991-08-16 | Well Log Performed |
1991-08-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-08-17 | Plug Back Performed |
1991-08-17 | Well Log Performed |
1991-08-18 | Perforation Treatment Performed - Jet Perforation |
1991-08-18 | Perforation Treatment Performed - Remedial Casing |
1991-08-18 | Well Mode changed to Abandoned |
1991-08-19 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-01-16 | Perforation | 1855.00 | 1858.00 | 13 |
1980-01-17 | Fracture | 1855.00 | 1858.00 | 0 |
1980-02-22 | Acid Treatment | 1855.00 | 1858.00 | 0 |
1980-02-24 | Nitrogen Treatment | 1855.00 | 1858.00 | 0 |
1991-08-17 | Packing Device Capped w/Cement | 1842.00 | 1850.00 | 0 |
1991-08-18 | Perforation | 372.00 | 373.00 | 14 |
1991-08-18 | Remedial Casing Cementing | 372.00 | 373.00 | 0 |
For data sources see[4]