X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0745062612000

Well Details

Well ID: 0745062612000
Loading map...
Location: 00/12-26-074-06W5/0
Location Alias: 00/12-26-74-06 W5M
Location Alias 2: 00/12-26-074-06 W5/00
Country: Canada
Province: Alberta
Township: 074
Meridian: 5
Range: 06
Section: 26
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: STAR ET AL MITSUE 12-26-74-6
Operator Name: ARC Resources Ltd.
License Number: 0104905
License Date: 1983-12-28
License Status: RecCertified
Spud Date: 1984-01-12
Final Drill Date: 1984-02-18
Well Total Depth: 1861.00 m
Surface Hole Latitude: 55.444129
Surface Hole Longitude: -114.816307

For data sources see[1][2]

Well History

Date Event
1983-12-28 Obtained License
1984-01-12 Direction Drilling Operation Performed - 98
1984-02-18 Finished Drilling
1984-02-18 Well Log Performed
1984-02-18 Well Mode changed to Drilled and Cased
1984-02-19 Well Log Performed
1984-02-20 Drill Stem Test Performed
1984-02-21 Drill Stem Test Performed
1984-02-23 Production Casing Operation Performed
1984-02-23 Well Log Performed
1984-06-27 Well Log Performed
1984-06-28 Perforation Treatment Performed - Jet Perforation
1984-06-29 Perforation Treatment Performed - Fractured
1984-07-22 Well Began Production
1984-07-22 Well Fluid changed to Crude Oil
1984-07-22 Well Mode changed to Pumping
1993-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-02-20 Plug Back Performed
1993-02-20 Well Fluid changed to Crude Oil
1993-02-20 Well Mode changed to Abandoned
1993-02-21 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1984-01-12 939.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-06-28 Perforation 1825.50 1830.50 13
1984-06-29 Fracture 1825.50 1830.50 0
1993-02-20 Packing Device Capped w/Cement 1807.00 1815.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 2492 0.0 0.0 0.0
1985 7560 0.0 0.0 0.0
1986 8423 0.0 0.0 0.0
1987 6192 0.0 0.0 0.0
1988 2088 0.0 0.0 0.0
1989 2160 0.0 0.0 0.0

For data sources see[6]

References