X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0744233110000

Well Details

Well ID: 0744233110000
Loading map...
Location: 00/10-31-074-23W4/0
Location Alias: 00/10-31-74-23 W4M
Location Alias 2: 00/10-31-074-23 W4/00
Country: Canada
Province: Alberta
Township: 074
Meridian: 4
Range: 23
Section: 31
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PEOC MARTENH 10-31-74-23
Operator Name: Sequoia Resources Corp.
License Number: 0031843
License Date: 1967-02-24
License Status: Suspension
Spud Date: 1967-03-13
Final Drill Date: 1967-03-21
Well Total Depth: 630.90 m
Surface Hole Latitude: 55.455363
Surface Hole Longitude: -113.529006

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-02-24 Obtained License
1967-03-17 Drill Stem Test Performed
1967-03-19 Drill Stem Test Performed
1967-03-21 Finished Drilling
1967-03-23 Production Casing Operation Performed
1967-04-11 Well Mode changed to Drilled and Cased
1968-02-19 Perforation Treatment Performed - Acid Wash - No Pressure
1968-02-19 Perforation Treatment Performed - Jet Perforation
1968-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1968-02-23 Perforation Treatment Performed - Acid Wash - No Pressure
1968-02-23 Perforation Treatment Performed - Jet Perforation
1968-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-02-25 Perforation Treatment Performed - Cement Squeeze
1968-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-02-26 Perforation Treatment Performed - Jet Perforation
1968-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-02-28 Perforation Treatment Performed - Cement Squeeze
1968-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-03-02 Perforation Treatment Performed - Cement Squeeze
1968-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-03-07 Perforation Treatment Performed - Jet Perforation
1969-11-10 Well Began Production
1969-11-10 Well Fluid changed to Gas
1969-11-10 Well Mode changed to Flowing
1999-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-01-09 Perforation Treatment Performed - Jet Perforation
1999-01-09 Plug Back Performed
1999-01-09 Well Fluid changed to Gas
1999-01-09 Well Mode changed to Abandoned Zone
1999-01-10 Perforation Treatment Performed - Jet Perforation
1999-01-11 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-02-19 Perforation 628.50 629.70 7
1968-02-26 Acid Treatment 392.00 397.80 0
1968-02-27 Acid Treatment 392.00 397.80 0
1968-02-28 Cement Squeeze 392.00 397.80 0
1968-03-02 Acid Treatment 392.00 397.80 0
1968-03-02 Cement Squeeze 392.00 397.80 0
1968-03-07 Perforation 605.90 609.60 3
1968-03-07 Acid Treatment 605.90 609.60 0
1999-01-09 Packing Device Capped w/Cement 582.00 590.00 0
1999-01-09 Perforation 499.90 501.40 30
1999-01-10 Perforation 485.90 486.80 19
1968-02-19 Acid Wash 628.50 629.70 0
1999-01-11 Perforation 463.90 464.80 19
1999-01-11 Perforation 432.80 434.00 26
1968-02-22 Packing Device Capped w/Cement 626.40 626.40 0
1968-02-23 Perforation 500.80 502.90 3
1968-02-23 Acid Wash 500.80 502.90 0
1968-02-24 Acid Treatment 500.80 502.90 0
1968-02-25 Cement Squeeze 500.80 502.90 0
1968-02-26 Perforation 392.00 393.20 7
1968-02-26 Perforation 395.30 397.80 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 214 0.0 0.0 0.0
1970 5256 0.0 0.0 0.0
1971 3535 0.0 0.0 0.0
1972 1806 0.0 0.0 0.0
1977 845 0.0 0.0 0.0
1978 1462 0.0 0.0 0.0
1983 8 0.0 0.0 0.0
1988 26 0.0 0.0 0.0

For data sources see[5]

References