X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0744151508000

Well Details

Well ID: 0744151508000
Loading map...
Location: 00/08-15-074-15W4/0
Location Alias: 00/08-15-74-15 W4M
Location Alias 2: 00/08-15-074-15 W4/00
Country: Canada
Province: Alberta
Township: 074
Meridian: 4
Range: 15
Section: 15
County/Municipality: Lac La Biche County
Well Name: TALISMAN ET AL DUNCAN 8-15-74-15
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0182241
License Date: 1995-11-17
License Status: RecCertified
Spud Date: 1996-01-07
Final Drill Date: 1996-01-09
Well Total Depth: 562.00 m
Surface Hole Latitude: 55.409517
Surface Hole Longitude: -112.213237

For data sources see[1][2]

Well History

Date Event
1995-11-17 Obtained License
1996-01-08 Surface Casing Operation Performed
1996-01-09 Finished Drilling
1996-01-09 Well Log Performed
1996-01-10 Production Casing Operation Performed
1996-01-10 Rig Released
1996-01-15 Perforation Treatment Performed - Jet Perforation
1996-01-15 Well Log Performed
1996-02-04 Well Mode changed to Drilled and Cased
1996-03-03 Well Began Production
1996-03-03 Well Fluid changed to Gas
1996-03-03 Well Mode changed to Flowing
1999-02-22 Perforation Treatment Performed - Jet Perforation
1999-02-22 Well Log Performed
1999-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-02-26 Plug Back Performed
1999-02-26 Well Fluid changed to Gas
1999-02-26 Well Log Performed
1999-02-26 Well Mode changed to Abandoned Zone
2000-02-07 Perforation Treatment Performed - Jet Perforation
2000-02-07 Well Log Performed
2002-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-25 Plug Back Performed
2002-01-25 Well Log Performed
2002-02-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-01-15 Perforation 549.00 549.80 13
1996-01-15 Perforation 551.00 551.50 13
1999-02-22 Perforation 520.00 521.00 14
1999-02-22 Perforation 533.80 534.80 14
1999-02-26 Packing Device Capped w/Cement 535.00 547.00 0
1999-02-26 Packing Device Capped w/Cement 504.00 512.00 0
2000-02-07 Perforation 364.50 367.00 13
2002-01-25 Packing Device Capped w/Cement 345.00 353.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 2737 0.0 0.0 0.0
1997 673 0.0 0.0 0.0

For data sources see[5]

References