X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0744150711002

Well Details

Well ID: 0744150711002
Loading map...
Location: 00/11-07-074-15W4/2
Location Alias: 00/11-07-74-15 W4M
Location Alias 2: 00/11-07-074-15 W4/02
Country: Canada
Province: Alberta
Township: 074
Meridian: 4
Range: 15
Section: 07
County/Municipality: Lac La Biche County
Well Name: BVI ET AL DUNCAN 11-7-74-15
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0056339
License Date: 1975-12-23
License Status: RecCertified
Spud Date: 1976-01-20
Final Drill Date: 1976-01-24
Well Total Depth: 512.40 m
Surface Hole Latitude: 55.395668
Surface Hole Longitude: -112.305922

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-12-23 Obtained License
1976-01-24 Finished Drilling
1976-01-24 Well Mode changed to Drilled and Cased
1976-01-25 Drill Stem Test Performed
1976-01-26 Drill Stem Test Performed
1976-01-27 Production Casing Operation Performed
1976-02-03 Perforation Treatment Performed - Jet Perforation
1976-02-04 Perforation Treatment Performed - Jet Perforation
1979-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-12-17 Perforation Treatment Performed - Jet Perforation
1980-03-25 Well Began Production
1980-03-25 Well Fluid changed to Gas
1980-03-25 Well Mode changed to Flowing
1980-08-01 Well Fluid changed to Gas
1980-08-01 Well Mode changed to Suspended
1998-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-01-19 Plug Back Performed
1998-01-19 Well Fluid changed to Gas
1998-01-19 Well Log Performed
1998-01-19 Well Mode changed to Abandoned Zone
1998-01-27 Well Abandoned
1998-01-27 Well Fluid changed to Gas
1998-01-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-02-03 Perforation 470.30 472.40 7
1976-02-03 Perforation 474.00 474.60 7
1976-02-03 Perforation 475.50 475.80 7
1976-02-03 Perforation 482.80 484.60 7
1976-02-04 Perforation 493.80 495.00 7
1979-12-16 Packing Device Capped w/Cement 457.20 457.20 0
1979-12-17 Perforation 298.10 298.70 13
1998-01-19 Packing Device Capped w/Cement 282.00 290.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 148 0.0 0.0 0.0
1986 92 0.0 0.0 0.0

For data sources see[5]

References