X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0735162408000

Well Details

Well ID: 0735162408000
Loading map...
Location: 00/08-24-073-16W5/0
Location Alias: 00/08-24-73-16 W5M
Location Alias 2: 00/08-24-073-16 W5/00
Country: Canada
Province: Alberta
Township: 073
Meridian: 5
Range: 16
Section: 24
County/Municipality: Big Lakes County
Well Name: GAO ET AL HIGH PRAIRIE 8-24-73-16
Operator Name: Phillips Petroleum Resources, Ltd.
License Number: 0127195
License Date: 1987-07-06
License Status: RecCertified
Spud Date: 1987-07-12
Final Drill Date: 1987-07-27
Well Total Depth: 2303.00 m
Surface Hole Latitude: 55.336320
Surface Hole Longitude: -116.309979

For data sources see[1][2]

Well History

Date Event
1987-07-06 Obtained License
1987-07-14 Surface Casing Operation Performed
1987-07-23 Well Log Performed
1987-07-27 Finished Drilling
1987-07-27 Well Mode changed to Drilled and Cased
1987-07-28 Drill Stem Test Performed
1987-07-28 Well Log Performed
1987-07-29 Drill Stem Test Performed
1987-07-30 Drill Stem Test Performed
1987-08-01 Production Casing Operation Performed
1987-08-02 Rig Released
1987-08-15 Perforation Treatment Performed - Jet Perforation
1987-08-16 Well Began Production
1987-08-16 Well Fluid changed to Crude Oil
1987-08-16 Well Mode changed to Flowing
1987-09-01 Well Fluid changed to Crude Oil
1987-09-01 Well Mode changed to Suspended
1987-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-05 Perforation Treatment Performed - Cement Squeeze
1987-10-09 Perforation Treatment Performed - Jet Perforation
1987-10-09 Well Fluid changed to Crude Oil
1987-10-09 Well Mode changed to Flowing
1987-10-16 Well Fluid changed to Crude Oil
1987-10-16 Well Mode changed to Suspended
1987-12-02 Well Fluid changed to Crude Oil
1987-12-02 Well Mode changed to Pumping
1993-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-09-12 Plug Back Performed
1993-09-12 Well Fluid changed to Crude Oil
1993-09-12 Well Mode changed to Abandoned
1993-09-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-08-15 Perforation 2257.00 2258.50 13
1987-10-04 Acid Treatment 2257.00 2258.50 0
1987-10-05 Cement Squeeze 2257.00 2258.50 0
1987-10-09 Perforation 2257.00 2258.50 13
1993-09-12 Packing Device Capped w/Cement 2242.00 2250.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 804 0.0 0.0 0.0
1988 7044 0.0 0.0 0.0
1989 7967 0.0 0.0 0.0
1990 7746 0.0 0.0 0.0
1991 7563 0.0 0.0 0.0
1992 6338 0.0 0.0 0.0

For data sources see[5]

References