X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0735052008000

Well Details

Well ID: 0735052008000
Loading map...
Location: 00/08-20-073-05W5/0
Location Alias: 00/08-20-73-05 W5M
Location Alias 2: 00/08-20-073-05 W5/00
Country: Canada
Province: Alberta
Township: 073
Meridian: 5
Range: 05
Section: 20
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CARDINAL MITSUE 8-20-73-5
Operator Name: Cardinal Energy Ltd.
License Number: 0125685
License Date: 1987-01-28
License Status: Suspension
Spud Date: 1987-02-22
Final Drill Date: 1987-03-12
Well Total Depth: 1702.00 m
Surface Hole Latitude: 55.335767
Surface Hole Longitude: -114.722292

For data sources see[1][2]

Well History

Date Event
1987-01-28 Obtained License
1987-02-25 Surface Casing Operation Performed
1987-02-28 Lost Circulation Occurred
1987-03-06 Intermediate Casing Operation Performed
1987-03-09 Kick Occurred
1987-03-12 Finished Drilling
1987-03-12 Well Mode changed to Drilled and Cased
1987-03-13 Well Log Performed
1987-03-14 Liner Casing Operation Performed
1987-03-15 Rig Released
1987-03-27 Perforation Treatment Performed - Jet Perforation
1987-05-01 Well Began Production
1987-05-01 Well Fluid changed to Crude Oil
1987-05-01 Well Mode changed to Flowing
1989-05-30 Perforation Treatment Performed - Chemical Squeeze
1989-06-06 Perforation Treatment Performed - Chemical Squeeze
1989-06-28 Well Log Performed
1989-08-16 Well Log Performed
1989-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-08-22 Perforation Treatment Performed - Chemical Squeeze
1989-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-08-29 Perforation Treatment Performed - Jet Perforation
1989-08-29 Well Log Performed
1989-08-31 Perforation Treatment Performed - Jet Perforation
1989-08-31 Well Log Performed
1989-09-06 Well Log Performed
1989-09-07 Perforation Treatment Performed - Jet Perforation
1989-09-07 Well Log Performed
1989-09-11 Perforation Treatment Performed - Jet Perforation
1989-09-11 Well Log Performed
1990-08-14 Well Fluid changed to Crude Oil
1990-08-14 Well Mode changed to Pumping
1993-02-25 Perforation Treatment Performed - Cement Plug
1993-07-01 Well Fluid changed to Crude Oil
1993-07-01 Well Mode changed to Suspended
2002-07-31 Perforation Treatment Performed - Jet Perforation
2002-08-02 Perforation Treatment Performed - Jet Perforation
2002-08-02 Well Log Performed
2002-08-08 Well Fluid changed to Crude Oil
2002-08-08 Well Mode changed to Flowing
2006-08-31 Well Fluid changed to Crude Oil
2006-08-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-03-27 Perforation 1657.00 1665.00 13
1989-09-07 Perforation 1657.10 1665.10 7
1989-09-11 Perforation 1665.60 1668.60 13
1993-02-25 Cement Plug 1591.00 1674.00 0
2002-07-31 Perforation 1657.10 1668.60 13
2002-08-02 Perforation 1657.00 1662.50 13
1987-03-27 Perforation 1665.50 1668.50 13
1989-05-30 Chemical Squeeze 1657.00 1668.50 0
1989-06-06 Chemical Squeeze 1657.00 1668.50 0
1989-08-20 Acid Treatment 1657.00 1668.50 0
1989-08-22 Chemical Squeeze 1657.00 1668.50 0
1989-08-29 Perforation 1657.10 1665.10 3
1989-08-29 Acid Treatment 1657.00 1668.50 0
1989-08-31 Perforation 1665.60 1668.60 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 4446 0.0 0.0 0.0
1988 7786 0.0 0.0 0.0
1989 5109 0.0 0.0 0.0
1990 7305 0.0 0.0 0.0
1991 8290 0.0 0.0 0.0
1992 6169 0.0 0.0 0.0
1993 18 0.0 0.0 0.0
2002 900 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1987-02-28 Lost Circulation 850.00 1325.00
1987-03-09 Kick 1663.50 1669.70

For data sources see[6]

References