X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0735022007000

Well Details

Well ID: 0735022007000
Loading map...
Location: 00/07-20-073-02W5/0
Location Alias: 00/07-20-73-02 W5M
Location Alias 2: 00/07-20-073-02 W5/00
Country: Canada
Province: Alberta
Township: 073
Meridian: 5
Range: 02
Section: 20
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: PEOC SPUR 7-20-73-2
Operator Name: Sequoia Resources Corp.
License Number: 0068791
License Date: 1978-03-13
License Status: Abandoned
Spud Date: 1978-03-18
Final Drill Date: 1978-03-20
Well Total Depth: 610.60 m
Surface Hole Latitude: 55.337588
Surface Hole Longitude: -114.265208

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-03-13 Obtained License
1978-03-20 Finished Drilling
1978-03-21 Drill Stem Test Performed
1978-03-22 Production Casing Operation Performed
1979-01-18 Perforation Treatment Performed - Open-Hole Completion
1979-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-01-21 Perforation Treatment Performed - Jet Perforation
1980-08-14 Well Mode changed to Drilled and Cased
1999-04-01 Well Began Production
1999-04-01 Well Fluid changed to Gas
1999-04-01 Well Mode changed to Flowing
2005-10-31 Well Fluid changed to Gas
2005-10-31 Well Mode changed to Suspended
2012-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-02 Plug Back Performed
2012-02-02 Well Fluid changed to Gas
2012-02-02 Well Mode changed to Abandoned Zone
2012-02-14 Well Abandoned
2012-02-14 Well Fluid changed to Gas
2012-02-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-01-18 Open Hole/Barefoot Completion 605.00 610.60 0
1979-01-21 Packing Device Capped w/Cement 577.00 585.00 0
1979-01-21 Perforation 415.60 416.20 13
2012-02-02 Packing Device Capped w/Cement 400.00 408.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 6086 0.0 0.0 0.0
2000 7835 0.0 0.0 0.0
2001 5638 0.0 0.0 0.0

For data sources see[5]

References