X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0734250916002

Well Details

Well ID: 0734250916002
Loading map...
Location: 00/16-09-073-25W4/2
Location Alias: 00/16-09-73-25 W4M
Location Alias 2: 00/16-09-073-25 W4/02
Country: Canada
Province: Alberta
Township: 073
Meridian: 4
Range: 25
Section: 09
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: PEOC SMITH 16-9-73-25
Operator Name: Sequoia Resources Corp.
License Number: 0143763
License Date: 1990-03-16
License Status: Suspension
Spud Date: 1990-03-18
Final Drill Date: 1990-03-21
Well Total Depth: 608.00 m
Surface Hole Latitude: 55.312525
Surface Hole Longitude: -113.780641

For data sources see[1][2]

Well History

Date Event
1990-03-16 Obtained License
1990-03-19 Surface Casing Operation Performed
1990-03-21 Finished Drilling
1990-03-21 Well Log Performed
1990-03-21 Well Mode changed to Drilled and Cased
1990-03-22 Production Casing Operation Performed
1990-03-22 Rig Released
1991-02-14 Well Log Performed
1991-02-15 Perforation Treatment Performed - Jet Perforation
1991-02-16 Perforation Treatment Performed - Jet Perforation
1991-02-16 Well Log Performed
2001-01-22 Perforation Treatment Performed - Jet Perforation
2001-01-22 Well Log Performed
2002-01-08 Well Log Performed
2009-01-14 Well Log Performed
2009-01-16 Perforation Treatment Performed - Cement Plug
2009-01-16 Plug Back Performed
2009-01-16 Well Log Performed
2009-01-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-17 Perforation Treatment Performed - Jet Perforation
2009-01-17 Plug Back Performed
2009-01-28 Well Began Production
2009-01-28 Well Fluid changed to Gas
2009-01-28 Well Mode changed to Flowing
2013-12-01 Well Fluid changed to Gas
2013-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-02-15 Perforation 424.50 427.00 13
1991-02-16 Perforation 414.50 419.50 10
2001-01-22 Perforation 380.00 381.50 17
2009-01-16 Cement Plug 519.00 592.00 0
2009-01-17 Packing Device Capped w/Cement 468.00 505.00 0
2009-01-17 Perforation 510.00 513.00 20
2009-01-17 Perforation 509.00 511.00 20
2009-01-17 Perforation 467.00 468.50 20
2009-01-17 Perforation 429.00 431.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 8101 0.0 0.0 0.0
2010 8689 0.0 0.0 0.0
2011 8363 0.0 0.0 0.0
2012 7073 0.0 0.0 0.0

For data sources see[5]

References