X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0734060105000

Well Details

Well ID: 0734060105000
Loading map...
Location: 00/05-01-073-06W4/0
Location Alias: 00/05-01-73-06 W4M
Location Alias 2: 00/05-01-073-06 W4/00
Country: Canada
Province: Alberta
Township: 073
Meridian: 4
Range: 06
Section: 01
County/Municipality: Improvement District No. 349
Well Name: CVE KIRBY 5-1-73-6
Operator Name: Cenovus Energy Inc.
License Number: 0100769
License Date: 1983-02-25
License Status: RecCertified
Spud Date: 1983-02-27
Final Drill Date: 1983-03-02
Well Total Depth: 568.00 m
Surface Hole Latitude: 55.293579
Surface Hole Longitude: -110.796643

For data sources see[1][2]

Well History

Date Event
1983-02-25 Obtained License
1983-03-02 Finished Drilling
1983-03-02 Production Casing Operation Performed
1983-03-02 Well Log Performed
1983-03-02 Well Mode changed to Drilled and Cased
1984-03-20 Well Log Performed
1984-07-12 Well Log Performed
1984-11-10 Well Log Performed
1985-01-30 Well Log Performed
1986-05-26 Perforation Treatment Performed - Jet Perforation
1986-05-27 Perforation Treatment Performed - Jet Perforation
1986-05-28 Perforation Treatment Performed - Jet Perforation
1986-08-21 Well Began Production
1986-08-21 Well Fluid changed to Crude Bitumen
1986-08-21 Well Type changed to Cyclical
1986-12-08 Well Log Performed
1987-01-08 Well Log Performed
1987-07-19 Well Fluid changed to Crude Bitumen
1987-07-19 Well Mode changed to Suspended
1987-07-19 Well Type changed to Cyclical
1990-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-01-18 Plug Back Performed
1990-01-18 Well Abandoned
1990-01-18 Well Fluid changed to Crude Bitumen
1990-01-18 Well Log Performed
1990-01-18 Well Mode changed to Abandoned
1990-01-18 Well Type changed to Cyclical

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-05-26 Perforation 485.00 485.50 13
1986-05-27 Perforation 475.60 478.50 13
1986-05-27 Perforation 480.00 485.00 13
1986-05-28 Perforation 473.50 478.50 13
1990-01-18 Packing Device Capped w/Cement 462.00 470.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 823 0.0 0.0 0.0
1987 3390 0.0 0.0 0.0

For data sources see[5]

References