If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0726131910000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.252927,"lon":-119.981636,"icon":""}]} |
Location: 00/10-19-072-13W6/0 | |
Location Alias: 00/10-19-72-13 W6M | |
Location Alias 2: 00/10-19-072-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 072 | |
Meridian: 6 | |
Range: 13 | |
Section: 19 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: CVE SINCLAIR 10-19-72-13 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0066423 | |
License Date: 1977-10-28 | |
License Status: RecCertified | |
Spud Date: 1977-11-03 | |
Final Drill Date: 1977-12-12 | |
Well Total Depth: 2272.00 m | |
Surface Hole Latitude: 55.252927 | |
Surface Hole Longitude: -119.981636 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1977-10-28 | Obtained License |
1977-11-07 | Lost Circulation Occurred |
1977-12-12 | Finished Drilling |
1977-12-15 | Production Casing Operation Performed |
1977-12-22 | Perforation Treatment Performed - Fractured |
1977-12-22 | Perforation Treatment Performed - Jet Perforation |
1978-05-25 | Perforation Treatment Performed - Alcohol Squeeze |
1978-06-09 | Perforation Treatment Performed - Cement Squeeze |
1978-06-12 | Perforation Treatment Performed - Cement Squeeze |
1978-06-14 | Perforation Treatment Performed - Cement Squeeze |
1978-06-17 | Perforation Treatment Performed - Cement Squeeze |
1978-06-19 | Perforation Treatment Performed - Cement Squeeze |
1978-06-23 | Perforation Treatment Performed - Jet Perforation |
1978-06-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-06-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1978-07-05 | Perforation Treatment Performed - Jet Perforation |
1978-07-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-07-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1978-07-11 | Perforation Treatment Performed - Jet Perforation |
1978-07-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-07-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1978-07-19 | Perforation Treatment Performed - Jet Perforation |
1978-07-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-07-25 | Well Mode changed to Drilled and Cased |
1979-07-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-07-26 | Well Abandoned |
1979-07-26 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1977-12-22 | Perforation | 1916.00 | 1922.10 | 13 |
1978-06-24 | Acid Treatment | 1951.90 | 1957.40 | 0 |
1978-06-29 | Packing Device Capped w/Cement | 1905.00 | 1912.60 | 0 |
1978-07-05 | Perforation | 1777.00 | 1785.20 | 13 |
1978-07-06 | Acid Treatment | 1777.00 | 1785.20 | 0 |
1978-07-11 | Packing Device Capped w/Cement | 1743.50 | 1751.10 | 0 |
1978-07-11 | Perforation | 1396.90 | 1403.30 | 13 |
1978-07-11 | Perforation | 1407.00 | 1410.00 | 13 |
1978-07-13 | Acid Treatment | 1396.90 | 1410.00 | 0 |
1978-07-18 | Packing Device Capped w/Cement | 1367.00 | 1374.60 | 0 |
1978-07-19 | Perforation | 635.20 | 641.00 | 13 |
1977-12-22 | Fracture | 1916.00 | 1922.10 | 0 |
1978-07-19 | Perforation | 646.50 | 652.30 | 13 |
1978-07-20 | Acid Treatment | 635.20 | 652.30 | 0 |
1979-07-26 | Packing Device Capped w/Cement | 624.80 | 624.80 | 0 |
1978-05-25 | Alchohol Squeeze | 1916.00 | 1922.10 | 0 |
1978-06-09 | Cement Squeeze | 1916.00 | 1922.10 | 0 |
1978-06-12 | Cement Squeeze | 1916.00 | 1922.10 | 0 |
1978-06-14 | Cement Squeeze | 1916.00 | 1922.10 | 0 |
1978-06-17 | Cement Squeeze | 1916.00 | 1922.10 | 0 |
1978-06-19 | Cement Squeeze | 1916.00 | 1922.10 | 0 |
1978-06-23 | Perforation | 1951.90 | 1957.40 | 13 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1977-11-07 | Lost Circulation | 411.50 | 413.30 |
For data sources see[5]