X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0726092110000

Well Details

Well ID: 0726092110000
Loading map...
Location: 00/10-21-072-09W6/0
Location Alias: 00/10-21-72-09 W6M
Location Alias 2: 00/10-21-072-09 W6/00
Country: Canada
Province: Alberta
Township: 072
Meridian: 6
Range: 09
Section: 21
County/Municipality: County of Grande Prairie No. 1
Well Name: BAYTEX ALBRT 10-21-72-9
Operator Name: Baytex Energy Ltd.
License Number: 0182146
License Date: 1995-11-15
License Status: Abandoned
Spud Date: 1995-11-21
Final Drill Date: 1995-12-05
Well Total Depth: 2437.00 m
Surface Hole Latitude: 55.252732
Surface Hole Longitude: -119.316824

For data sources see[1][2]

Well History

Date Event
1995-11-15 Obtained License
1995-11-22 Surface Casing Operation Performed
1995-12-05 Finished Drilling
1995-12-05 Well Log Performed
1995-12-06 Well Log Performed
1995-12-10 Drill Stem Test Performed
1995-12-12 Production Casing Operation Performed
1995-12-13 Rig Released
1995-12-13 Well Mode changed to Drilled and Cased
1995-12-19 Well Log Performed
1995-12-20 Perforation Treatment Performed - Jet Perforation
1995-12-20 Well Log Performed
1995-12-29 Perforation Treatment Performed - Fractured
1996-03-04 Well Log Performed
1996-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-05 Perforation Treatment Performed - Jet Perforation
1996-03-05 Plug Back Performed
1996-03-05 Well Log Performed
1996-03-05 Well Mode changed to Abandoned Zone
1996-03-08 Well Log Performed
1996-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-03-10 Perforation Treatment Performed - Cement Squeeze
1996-03-12 Well Log Performed
1996-03-13 Perforation Treatment Performed - Jet Perforation
1996-03-14 Perforation Treatment Performed - Cement Squeeze
1996-03-16 Well Log Performed
1996-03-17 Perforation Treatment Performed - Jet Perforation
1996-03-21 Well Log Performed
2000-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-08-20 Plug Back Performed
2000-08-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-08-22 Perforation Treatment Performed - Jet Perforation
2000-08-23 Perforation Treatment Performed - Cement Squeeze
2000-08-23 Perforation Treatment Performed - Jet Perforation
2000-08-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-08-24 Perforation Treatment Performed - Jet Perforation
2000-08-24 Perforation Treatment Performed - Remedial Casing
2000-08-24 Well Log Performed
2000-08-25 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-12-20 Perforation 2102.00 2106.00 13
1996-03-17 Perforation 1198.50 1200.50 17
2000-08-20 Packing Device Capped w/Cement 1207.00 1215.00 0
2000-08-20 Packing Device Capped w/Cement 1182.00 1190.00 0
2000-08-21 Packing Device Capped w/Cement 1162.00 1170.00 0
2000-08-22 Perforation 1080.00 1080.50 17
2000-08-22 Perforation 1056.00 1056.50 17
2000-08-22 Perforation 655.00 655.50 17
2000-08-23 Cement Squeeze 1056.00 1080.50 0
2000-08-23 Perforation 415.00 415.50 17
2000-08-24 Packing Device Capped w/Cement 637.00 645.00 0
1995-12-29 Fracture 2102.00 2106.00 0
2000-08-24 Perforation 515.00 515.50 17
2000-08-24 Remedial Casing Cementing 415.00 515.50 0
1996-03-05 Packing Device Capped w/Cement 2078.00 2085.00 0
1996-03-05 Perforation 1225.00 1226.00 13
1996-03-05 Perforation 1175.00 1176.00 13
1996-03-10 Acid Treatment 1225.00 1226.00 0
1996-03-10 Cement Squeeze 1225.00 1226.00 0
1996-03-13 Perforation 1175.00 1176.00 13
1996-03-14 Cement Squeeze 1175.00 1176.00 0

For data sources see[4]



References