X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0716102003000

Well Details

Well ID: 0716102003000
Loading map...
Location: 00/03-20-071-10W6/0
Location Alias: 00/03-20-71-10 W6M
Location Alias 2: 00/03-20-071-10 W6/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 6
Range: 10
Section: 20
County/Municipality: County of Grande Prairie No. 1
Well Name: CARDINAL ELM 3-20-71-10
Operator Name: Cardinal Energy Ltd.
License Number: 0486176
License Date: 2017-11-06
License Status: Issued
Spud Date: 2017-11-17
Final Drill Date: 2017-11-24
Well Total Depth: 2522.00 m
Surface Hole Latitude: 55.168799
Surface Hole Longitude: -119.505088

For data sources see[1][2]

Well History

Date Event
2017-11-06 Obtained License
2017-11-18 Surface Casing Operation Performed
2017-11-19 Direction Drilling Operation Performed - Deviate
2017-11-20 Direction Drilling Operation Performed - Horizontal
2017-11-20 Intermediate Casing Operation Performed
2017-11-20 Well Log Performed
2017-11-24 Finished Drilling
2017-11-24 Liner Casing Operation Performed
2017-11-24 Well Log Performed
2017-11-24 Well Mode changed to Drilled and Cased
2017-11-25 Perforation Treatment Performed - Open-Hole Completion
2017-11-25 Rig Released
2017-12-07 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-17 Well Began Production
2017-12-17 Well Fluid changed to Crude Oil
2017-12-17 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-11-17 Nabors Drilling Canada Limited 31 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-11-19 1081.50 Deviate (5 - 79 degrees)
2017-11-20 1466.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-11-25 Open Hole/Barefoot Completion 2517.00 2522.00 0
2017-12-08 Multi-Stage Fracture 1929.30 1929.40 0
2017-12-08 Multi-Stage Fracture 1867.50 1867.60 0
2017-12-08 Multi-Stage Fracture 1805.70 1805.80 0
2017-12-08 Multi-Stage Fracture 1732.90 1733.00 0
2017-12-08 Multi-Stage Fracture 1671.10 1671.20 0
2017-12-08 Multi-Stage Fracture 1608.80 1608.90 0
2017-12-08 Multi-Stage Fracture 1546.70 1546.80 0
2017-12-07 Multi-Stage Fracture 2498.40 2498.50 0
2017-12-08 Multi-Stage Fracture 2443.90 2444.00 0
2017-12-08 Multi-Stage Fracture 2370.60 2370.80 0
2017-12-08 Multi-Stage Fracture 2307.00 2307.10 0
2017-12-08 Multi-Stage Fracture 2187.80 2187.90 0
2017-12-08 Multi-Stage Fracture 2125.80 2125.90 0
2017-12-08 Multi-Stage Fracture 2064.20 2064.30 0
2017-12-08 Multi-Stage Fracture 2001.90 2002.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-12-07 2017-12-08 1,351 898 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 79.1324 N/A
20/40 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 20.1208 N/A
Econocide B1008 (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.011 N/A
Methyl Alcohol 67-56-1 100 0.011 N/A
Non-Hazardous Ingredients Not Available 100 0.011 N/A
SBO-1 (Breaker) Step Energy Services Breaker Disodium peroxydisulfate 7775-27-1 100 0.0068 N/A
SCS-8 (Clay Control) Step Energy Services Clay Control Inorganic Salt Not Available 100 0.1296 N/A
SBX-1 (Crosslinker) Step Energy Services Crosslinker Boric Acid 10043-35-3 100 0.114 N/A
Ethylene Glycol 107-21-1 100 0.114 N/A
Non-Hazardous Ingredients Not Available 100 0.114 N/A
Potassium Carbonate 584-08-7 100 0.114 N/A
Potassium Hydroxide 1310-58-3 100 0.114 N/A
SNE-3 (Non-Emulsifier) Step Energy Services Demulsifier Isopropyl Alcohol 67-63-0 100 0.0787 N/A
Methyl Alcohol 67-56-1 100 0.0787 N/A
Non-Hazardous Ingredients Not Available 100 0.0787 N/A
Oxydi-2.1-ethyldiyl)bis(cocoalkyl)dimethyl
ammonium dichloride
68607-28-3 100 0.0787 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.3778 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.3778 N/A
SSI-1 (Scale Inhibitor) Step Energy Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0285 N/A
Non-Hazardous Ingredients Not Available 100 0.0285 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-12-03 2017-12-03 Surface Water - Runoff 720

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 377 0.0 0.0 0.0
2018 8730 0.0 0.0 0.0
2019 8412 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-25 No Incident Encountered 0.00 0.00
2017-12-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References