If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0715181502000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/02-15-071-18W5/0 | |
| Location Alias: 00/02-15-71-18 W5M | |
| Location Alias 2: 00/02-15-071-18 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 071 | |
| Meridian: 5 | |
| Range: 18 | |
| Section: 15 | |
| County/Municipality: Big Lakes County | |
| Well Name: WRM SNIPE LAKE 2-15-71-18 | |
| Operator Name: White Resource Management Ltd. | |
| License Number: 0066708 | |
| License Date: 1977-11-14 | |
| License Status: RecCertified | |
| Spud Date: 1977-12-26 | |
| Final Drill Date: 1978-08-10 | |
| Well Total Depth: 2670.00 m | |
| Surface Hole Latitude: 55.144724 | |
| Surface Hole Longitude: -116.676167 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1977-11-14 | Obtained License |
| 1978-08-10 | Finished Drilling |
| 1978-08-10 | Well Mode changed to Drilled and Cased |
| 1978-08-14 | Production Casing Operation Performed |
| 1978-08-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1978-08-29 | Perforation Treatment Performed - Jet Perforation |
| 1978-10-23 | Well Began Production |
| 1978-10-23 | Well Fluid changed to Crude Oil |
| 1978-10-23 | Well Mode changed to Pumping |
| 1978-11-09 | Well Fluid changed to Crude Oil |
| 1978-11-09 | Well Mode changed to Suspended |
| 1979-03-06 | Well Fluid changed to Crude Oil |
| 1979-03-06 | Well Mode changed to Pumping |
| 1979-07-23 | Perforation Treatment Performed - Fractured |
| 1979-09-24 | Well Fluid changed to Crude Oil |
| 1979-09-24 | Well Mode changed to Suspended |
| 1981-03-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1981-03-10 | Well Abandoned |
| 1981-03-10 | Well Fluid changed to Crude Oil |
| 1981-03-10 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1978-08-29 | Perforation | 2636.50 | 2638.50 | 10 |
| 1978-08-29 | Perforation | 2641.00 | 2642.00 | 10 |
| 1978-08-29 | Acid Treatment | 2636.50 | 2642.00 | 0 |
| 1979-07-23 | Fracture | 2636.50 | 2642.00 | 0 |
| 1981-03-10 | Packing Device Capped w/Cement | 2633.00 | 2633.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1978 | 298 | 0.0 | 0.0 | 0.0 |
| 1979 | 1277 | 0.0 | 0.0 | 0.0 |
For data sources see[5]