X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0715180402000

Well Details

Well ID: 0715180402000
Loading map...
Location: 00/02-04-071-18W5/0
Location Alias: 00/02-04-71-18 W5M
Location Alias 2: 00/02-04-071-18 W5/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 5
Range: 18
Section: 04
County/Municipality: Big Lakes County
Well Name: POCO SNIPE IN 2-4-71-18
Operator Name: Long Run Exploration Ltd.
License Number: 0025641
License Date: 1964-02-04
License Status: Abandoned
Spud Date: 1964-02-08
Final Drill Date: 1964-02-27
Well Total Depth: 2628.90 m
Surface Hole Latitude: 55.114979
Surface Hole Longitude: -116.702222

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-02-04 Obtained License
1964-02-27 Finished Drilling
1964-02-27 Well Mode changed to Drilled and Cased
1964-02-28 Production Casing Operation Performed
1964-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-03-01 Perforation Treatment Performed - Jet Perforation
1964-03-02 Well Began Production
1964-03-02 Well Fluid changed to Crude Oil
1964-03-02 Well Mode changed to Flowing
1966-05-14 Perforation Treatment Performed - Jet Perforation
1966-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-06-04 Well Began Injection
1966-06-04 Well Fluid changed to Water
1966-06-04 Well Type changed to Injection
1966-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-08-02 Perforation Treatment Performed - Acid Wash - No Pressure
1972-08-09 Perforation Treatment Performed - Acid Wash - No Pressure
1973-08-03 Well Log Performed
1977-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-08 Perforation Treatment Performed - Jet Perforation
1978-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-13 Well Log Performed
1987-02-17 Well Log Performed
1987-04-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-04-04 Perforation Treatment Performed - Cement Plug
1989-04-04 Plug Back Performed
1989-04-05 Perforation Treatment Performed - Cement Plug
1989-04-05 Plug Back Performed
1989-04-05 Well Fluid changed to Water
1989-04-05 Well Mode changed to Abandoned
1989-04-05 Well Type changed to Injection
1989-04-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-03-01 Perforation 2592.90 2593.80 7
1966-05-15 Acid Treatment 2592.90 2617.00 0
1966-10-02 Acid Treatment 2607.90 2617.00 0
1971-11-13 Acid Treatment 2592.90 2617.00 0
1972-08-02 Acid Wash 2592.90 2617.00 0
1972-08-09 Acid Wash 2592.90 2617.00 0
1977-01-11 Acid Treatment 2592.90 2617.00 0
1977-10-21 Acid Treatment 2592.90 2617.00 0
1978-03-08 Perforation 2611.80 2618.50 13
1978-03-09 Acid Treatment 2611.80 2618.50 0
1978-10-31 Acid Treatment 2592.90 2618.50 0
1964-03-01 Perforation 2594.80 2595.10 7
1979-01-06 Acid Treatment 2592.90 2617.00 0
1980-03-15 Acid Treatment 2592.90 2617.00 0
1980-05-03 Acid Treatment 2592.90 2617.00 0
1980-10-18 Acid Treatment 2592.00 2617.00 0
1981-01-28 Acid Treatment 2592.90 2617.00 0
1981-06-05 Acid Treatment 2592.00 2617.00 0
1984-01-11 Acid Treatment 2592.00 2617.00 0
1987-04-03 Acid Treatment 2592.00 2617.00 0
1989-04-04 Cement Plug 2420.00 2563.00 0
1989-04-04 Cement Plug 1790.00 1887.00 0
1964-03-01 Perforation 2596.60 2596.90 7
1989-04-04 Cement Plug 529.90 611.20 0
1989-04-05 Cement Plug 142.20 265.00 0
1964-03-01 Perforation 2598.70 2599.30 7
1964-03-01 Perforation 2603.00 2605.10 7
1964-03-01 Acid Treatment 2592.90 2605.10 0
1966-05-14 Perforation 2607.90 2609.70 10
1966-05-14 Perforation 2611.80 2614.00 10
1966-05-14 Perforation 2615.20 2617.00 10

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0

For data sources see[5]

References