X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0715030601002

Well Details

Well ID: 0715030601002
Loading map...
Location: 00/01-06-071-03W5/2
Location Alias: 00/01-06-71-03 W5M
Location Alias 2: 00/01-06-071-03 W5/02
Country: Canada
Province: Alberta
Township: 071
Meridian: 5
Range: 03
Section: 06
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CARDINAL MITSUE 14-31-70-3
Operator Name: Cardinal Energy Ltd.
License Number: 0138369
License Date: 1989-01-20
License Status: Suspension
Spud Date: 1989-01-28
Final Drill Date: 1997-03-24
Well Total Depth: 2163.00 m
Surface Hole Latitude: 55.109994
Surface Hole Longitude: -114.449199

For data sources see[1][2]

Well History

Date Event
1989-01-20 Obtained License
1997-03-18 Direction Drilling Operation Performed - Horizontal
1997-03-24 Finished Drilling
1997-03-24 Well Log Performed
1997-03-24 Well Mode changed to Drilled and Cased
1997-03-25 Liner Casing Operation Performed
1997-03-25 Perforation Treatment Performed - Open-Hole Completion
1997-03-25 Perforation Treatment Performed - Slotted Liner or Casing
1997-03-25 Rig Released
1997-03-27 Well Log Performed
1997-03-28 Well Log Performed
1997-04-12 Well Began Production
1997-04-12 Well Fluid changed to Crude Oil
1997-04-12 Well Mode changed to Flowing
1998-07-31 Well Fluid changed to Crude Oil
1998-07-31 Well Mode changed to Pumping
2002-05-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-05-04 Plug Back Performed
2002-05-04 Well Fluid changed to Crude Oil
2002-05-04 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-03-18 1623.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-03-25 Slotted Liner 1616.00 1895.40 0
1997-03-25 Open Hole/Barefoot Completion 1895.40 2163.00 0
2002-05-04 Packing Device Capped w/Cement 1589.40 1597.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 3473 0.0 0.0 0.0
1998 1464 0.0 0.0 0.0
1999 4502 0.0 0.0 0.0
2000 8074 0.0 0.0 0.0
2001 5418 0.0 0.0 0.0
2002 996 0.0 0.0 0.0

For data sources see[6]

References