X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706092701000

Well Details

Well ID: 0706092701000
Loading map...
Location: 00/01-27-070-09W6/0
Location Alias: 00/01-27-70-09 W6M
Location Alias 2: 00/01-27-070-09 W6/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 09
Section: 27
County/Municipality: County of Grande Prairie No. 1
Well Name: TIDEWATER HZ ELM 1-27-70-9
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0492833
License Date: 2018-12-18
License Status: Amended
Spud Date: 2019-01-01
Final Drill Date: 2019-02-04
Well Total Depth: 5055.00 m
Surface Hole Latitude: 55.106387
Surface Hole Longitude: -119.266766

For data sources see[1][2]

Well History

Date Event
2018-12-18 Obtained License
2019-01-03 Surface Casing Operation Performed
2019-01-08 Direction Drilling Operation Performed - Deviate
2019-01-14 Direction Drilling Operation Performed - Horizontal
2019-01-17 Intermediate Casing Operation Performed
2019-02-04 Finished Drilling
2019-02-04 Well Mode changed to Drilled and Cased
2019-02-05 Rig Released
2019-02-05 Well Log Performed
2019-02-22 Perforation Treatment Performed - Open-Hole Completion
2019-02-23 Well Log Performed
2019-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-03-10 Well Log Performed
2019-09-01 Well Began Injection
2019-09-01 Well Fluid changed to Acid Gas
2019-09-01 Well Type changed to Disposal

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2019-01-08 2310.60 Deviate (5 - 79 degrees)
2019-01-14 2928.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-02-22 Open Hole/Barefoot Completion 3001.00 5055.00 0
2019-03-03 Acid Treatment 3665.00 3775.00 0
2019-03-04 Acid Treatment 3475.00 3665.00 0
2019-03-04 Acid Treatment 3400.00 3475.00 0
2019-03-04 Acid Treatment 3200.00 3400.00 0
2019-03-05 Acid Treatment 3075.00 3200.00 0
2019-03-05 Acid Treatment 3004.00 3075.00 0
2019-03-01 Acid Treatment 4920.00 5055.00 0
2019-03-02 Acid Treatment 4700.00 4920.00 0
2019-03-02 Acid Treatment 4350.00 4475.00 0
2019-03-02 Acid Treatment 4230.00 4350.00 0
2019-03-03 Acid Treatment 4100.00 4230.00 0
2019-03-03 Acid Treatment 3975.00 4100.00 0
2019-03-03 Acid Treatment 3850.00 3975.00 0
2019-03-03 Acid Treatment 3775.00 3850.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-05 No Incident Encountered 0.00 0.00
2019-03-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References