X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0705230815003

Well Details

Well ID: 0705230815003
Loading map...
Location: 00/15-08-070-23W5/3
Location Alias: 00/15-08-70-23 W5M
Location Alias 2: 00/15-08-070-23 W5/03
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 23
Section: 08
County/Municipality: Sturgeon Lake 154
Well Name: GULF ET AL STURLS 15-8-70-23
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0027227
License Date: 1964-11-24
License Status: Re-Entered
Spud Date: 1964-11-28
Final Drill Date: 1964-12-30
Well Total Depth: 2673.10 m
Surface Hole Latitude: 55.052130
Surface Hole Longitude: -117.467722

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-11-24 Obtained License
1964-12-30 Finished Drilling
1964-12-30 Well Mode changed to Drilled and Cased
1964-12-31 Production Casing Operation Performed
1965-01-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-01-05 Perforation Treatment Performed - Jet Perforation
1965-01-11 Perforation Treatment Performed - Cement Squeeze
1965-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-01-13 Perforation Treatment Performed - Bullet Perforation
1975-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-08-09 Perforation Treatment Performed - Cement Squeeze
1975-08-12 Perforation Treatment Performed - Cement Squeeze
1975-08-12 Perforation Treatment Performed - Jet Perforation
1975-08-16 Perforation Treatment Performed - Jet Perforation
1975-08-20 Perforation Treatment Performed - Jet Perforation
1976-04-26 Well Began Production
1976-04-26 Well Fluid changed to Gas
1976-04-26 Well Mode changed to Flowing
1977-01-01 Well Structure changed to Commingled
1985-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-01-26 Plug Back Performed
1985-01-26 Well Abandoned
1986-01-25 Well Log Performed
1986-02-06 Well Log Performed
1986-02-07 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-01-05 Perforation 2662.10 2662.70 7
1975-08-12 Cement Squeeze 1508.80 1509.10 0
1975-08-12 Perforation 1444.80 1445.10 13
1975-08-12 Cement Squeeze 1444.80 1445.10 0
1975-08-12 Cement Squeeze 1444.80 1445.10 0
1975-08-16 Perforation 1452.40 1455.40 13
1975-08-20 Perforation 1433.20 1435.00 13
1975-08-20 Perforation 1436.20 1437.40 13
1985-01-26 Packing Device Capped w/Cement 1422.00 1430.00 0
1965-01-05 Acid Treatment 2662.10 2662.70 0
1965-01-11 Cement Squeeze 2662.10 2662.70 0
1965-01-13 Bullet Perforation 2661.20 2661.80 13
1965-01-13 Bullet Perforation 2662.70 2663.00 7
1965-01-13 Acid Treatment 2661.20 2663.00 0
1975-08-09 Cement Squeeze 2661.20 2663.00 0
1975-08-09 Packing Device Capped w/Cement 2563.40 2563.40 0
1975-08-12 Perforation 1508.80 1509.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2039 0.0 0.0 0.0

For data sources see[5]

References