If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0705181212000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.048601,"lon":-116.61646,"icon":""}]} |
Location: 00/12-12-070-18W5/0 | |
Location Alias: 00/12-12-70-18 W5M | |
Location Alias 2: 00/12-12-070-18 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 070 | |
Meridian: 5 | |
Range: 18 | |
Section: 12 | |
County/Municipality: Big Lakes County | |
Well Name: LONG RUN SNIPELK 12-12-70-18 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0025018 | |
License Date: 1963-10-28 | |
License Status: Abandoned | |
Spud Date: 1963-11-04 | |
Final Drill Date: 1963-11-24 | |
Well Total Depth: 2712.70 m | |
Surface Hole Latitude: 55.048601 | |
Surface Hole Longitude: -116.616460 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1963-10-28 | Obtained License |
1963-11-24 | Finished Drilling |
1963-11-24 | Well Mode changed to Drilled and Cased |
1963-11-26 | Production Casing Operation Performed |
1963-11-28 | Perforation Treatment Performed - Jet Perforation |
1963-11-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-12-06 | Well Began Production |
1963-12-06 | Well Fluid changed to Crude Oil |
1963-12-06 | Well Mode changed to Flowing |
1964-07-31 | Perforation Treatment Performed - Jet Perforation |
1964-08-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-11-01 | Well Fluid changed to Crude Oil |
1966-11-01 | Well Mode changed to Suspended |
1986-11-03 | Well Fluid changed to Crude Oil |
1986-11-03 | Well Mode changed to Pumping |
1986-12-03 | Well Fluid changed to Crude Oil |
1986-12-03 | Well Mode changed to Suspended |
2010-03-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-03-02 | Perforation Treatment Performed - Jet Perforation |
2010-03-02 | Plug Back Performed |
2010-03-02 | Well Fluid changed to Crude Oil |
2010-03-02 | Well Mode changed to Abandoned Zone |
2010-03-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-03-05 | Perforation Treatment Performed - Cement Plug |
2010-03-05 | Perforation Treatment Performed - Remedial Casing |
2010-08-19 | Perforation Treatment Performed - Jet Perforation |
2010-08-19 | Well Log Performed |
2010-08-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-08-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-08-21 | Perforation Treatment Performed - Remedial Casing |
2010-08-21 | Well Log Performed |
2010-08-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-08-22 | Perforation Treatment Performed - Jet Perforation |
2010-08-22 | Well Log Performed |
2010-08-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-08-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-08-23 | Perforation Treatment Performed - Jet Perforation |
2010-08-23 | Well Log Performed |
2010-08-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-08-24 | Perforation Treatment Performed - Jet Perforation |
2010-08-24 | Perforation Treatment Performed - Remedial Casing |
2010-08-24 | Well Log Performed |
2010-08-26 | Perforation Treatment Performed - Cement Plug |
2010-09-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-09-02 | Perforation Treatment Performed - Remedial Casing |
2010-09-03 | Well Abandoned |
2010-09-03 | Well Fluid changed to Crude Oil |
2010-09-03 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1963-11-28 | Perforation | 2677.70 | 2680.70 | 7 |
2010-03-05 | Cement Plug | 1420.00 | 1428.50 | 0 |
2010-03-05 | Packing Device Capped w/Cement | 1408.00 | 1420.00 | 0 |
2010-08-19 | Perforation | 1069.20 | 1070.20 | 20 |
2010-08-19 | Perforation | 1373.30 | 1374.30 | 20 |
2010-08-20 | Packing Device Capped w/Cement | 1354.00 | 1364.00 | 0 |
2010-08-21 | Remedial Casing Cementing | 1069.20 | 1070.20 | 0 |
2010-08-21 | Packing Device Capped w/Cement | 1057.00 | 1066.00 | 0 |
2010-08-22 | Perforation | 858.00 | 859.00 | 20 |
2010-08-22 | Perforation | 1047.00 | 1048.00 | 20 |
2010-08-22 | Packing Device Capped w/Cement | 1031.00 | 1040.00 | 0 |
1963-11-30 | Acid Treatment | 2677.70 | 2680.70 | 0 |
2010-08-23 | Packing Device Capped w/Cement | 841.00 | 850.00 | 0 |
2010-08-23 | Perforation | 551.90 | 552.90 | 20 |
2010-08-23 | Acid Treatment | 551.90 | 552.90 | 0 |
2010-08-24 | Remedial Casing Cementing | 551.90 | 552.90 | 0 |
2010-08-24 | Packing Device Capped w/Cement | 540.50 | 550.00 | 0 |
2010-08-24 | Perforation | 185.30 | 186.30 | 20 |
2010-08-24 | Perforation | 481.00 | 482.00 | 20 |
2010-08-24 | Perforation | 529.00 | 530.00 | 20 |
2010-08-26 | Cement Plug | 449.20 | 540.50 | 0 |
2010-09-02 | Remedial Casing Cementing | 185.30 | 186.30 | 0 |
1964-07-31 | Perforation | 2681.30 | 2683.20 | 7 |
2010-09-02 | Packing Device Capped w/Cement | 173.50 | 183.50 | 0 |
1964-07-31 | Perforation | 2684.10 | 2685.00 | 7 |
1964-08-01 | Acid Treatment | 2677.70 | 2685.00 | 0 |
2010-03-02 | Packing Device Capped w/Cement | 2661.50 | 2669.50 | 0 |
2010-03-02 | Perforation | 1478.00 | 1479.00 | 13 |
2010-03-05 | Remedial Casing Cementing | 1478.00 | 1479.00 | 0 |
2010-03-05 | Packing Device Capped w/Cement | 1428.50 | 1476.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1986 | 195 | 0.0 | 0.0 | 0.0 |
For data sources see[5]