X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0705181212000

Well Details

Well ID: 0705181212000
Loading map...
Location: 00/12-12-070-18W5/0
Location Alias: 00/12-12-70-18 W5M
Location Alias 2: 00/12-12-070-18 W5/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 18
Section: 12
County/Municipality: Big Lakes County
Well Name: LONG RUN SNIPELK 12-12-70-18
Operator Name: Long Run Exploration Ltd.
License Number: 0025018
License Date: 1963-10-28
License Status: Abandoned
Spud Date: 1963-11-04
Final Drill Date: 1963-11-24
Well Total Depth: 2712.70 m
Surface Hole Latitude: 55.048601
Surface Hole Longitude: -116.616460

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-10-28 Obtained License
1963-11-24 Finished Drilling
1963-11-24 Well Mode changed to Drilled and Cased
1963-11-26 Production Casing Operation Performed
1963-11-28 Perforation Treatment Performed - Jet Perforation
1963-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-12-06 Well Began Production
1963-12-06 Well Fluid changed to Crude Oil
1963-12-06 Well Mode changed to Flowing
1964-07-31 Perforation Treatment Performed - Jet Perforation
1964-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-11-01 Well Fluid changed to Crude Oil
1966-11-01 Well Mode changed to Suspended
1986-11-03 Well Fluid changed to Crude Oil
1986-11-03 Well Mode changed to Pumping
1986-12-03 Well Fluid changed to Crude Oil
1986-12-03 Well Mode changed to Suspended
2010-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-02 Perforation Treatment Performed - Jet Perforation
2010-03-02 Plug Back Performed
2010-03-02 Well Fluid changed to Crude Oil
2010-03-02 Well Mode changed to Abandoned Zone
2010-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-05 Perforation Treatment Performed - Cement Plug
2010-03-05 Perforation Treatment Performed - Remedial Casing
2010-08-19 Perforation Treatment Performed - Jet Perforation
2010-08-19 Well Log Performed
2010-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-21 Perforation Treatment Performed - Remedial Casing
2010-08-21 Well Log Performed
2010-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-22 Perforation Treatment Performed - Jet Perforation
2010-08-22 Well Log Performed
2010-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-23 Perforation Treatment Performed - Jet Perforation
2010-08-23 Well Log Performed
2010-08-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-24 Perforation Treatment Performed - Jet Perforation
2010-08-24 Perforation Treatment Performed - Remedial Casing
2010-08-24 Well Log Performed
2010-08-26 Perforation Treatment Performed - Cement Plug
2010-09-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-02 Perforation Treatment Performed - Remedial Casing
2010-09-03 Well Abandoned
2010-09-03 Well Fluid changed to Crude Oil
2010-09-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-11-28 Perforation 2677.70 2680.70 7
2010-03-05 Cement Plug 1420.00 1428.50 0
2010-03-05 Packing Device Capped w/Cement 1408.00 1420.00 0
2010-08-19 Perforation 1069.20 1070.20 20
2010-08-19 Perforation 1373.30 1374.30 20
2010-08-20 Packing Device Capped w/Cement 1354.00 1364.00 0
2010-08-21 Remedial Casing Cementing 1069.20 1070.20 0
2010-08-21 Packing Device Capped w/Cement 1057.00 1066.00 0
2010-08-22 Perforation 858.00 859.00 20
2010-08-22 Perforation 1047.00 1048.00 20
2010-08-22 Packing Device Capped w/Cement 1031.00 1040.00 0
1963-11-30 Acid Treatment 2677.70 2680.70 0
2010-08-23 Packing Device Capped w/Cement 841.00 850.00 0
2010-08-23 Perforation 551.90 552.90 20
2010-08-23 Acid Treatment 551.90 552.90 0
2010-08-24 Remedial Casing Cementing 551.90 552.90 0
2010-08-24 Packing Device Capped w/Cement 540.50 550.00 0
2010-08-24 Perforation 185.30 186.30 20
2010-08-24 Perforation 481.00 482.00 20
2010-08-24 Perforation 529.00 530.00 20
2010-08-26 Cement Plug 449.20 540.50 0
2010-09-02 Remedial Casing Cementing 185.30 186.30 0
1964-07-31 Perforation 2681.30 2683.20 7
2010-09-02 Packing Device Capped w/Cement 173.50 183.50 0
1964-07-31 Perforation 2684.10 2685.00 7
1964-08-01 Acid Treatment 2677.70 2685.00 0
2010-03-02 Packing Device Capped w/Cement 2661.50 2669.50 0
2010-03-02 Perforation 1478.00 1479.00 13
2010-03-05 Remedial Casing Cementing 1478.00 1479.00 0
2010-03-05 Packing Device Capped w/Cement 1428.50 1476.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1986 195 0.0 0.0 0.0

For data sources see[5]

References