If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0705170605002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.034561,"lon":-116.591001,"icon":""}]} |
Location: 00/05-06-070-17W5/2 | |
Location Alias: 00/05-06-70-17 W5M | |
Location Alias 2: 00/05-06-070-17 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 070 | |
Meridian: 5 | |
Range: 17 | |
Section: 06 | |
County/Municipality: Big Lakes County | |
Well Name: LONG RUN SNIPELK 12-6-70-17 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0170221 | |
License Date: 1994-09-07 | |
License Status: Abandoned | |
Spud Date: 1994-09-18 | |
Final Drill Date: 1994-10-28 | |
Well Total Depth: 2985.00 m | |
Surface Hole Latitude: 55.034561 | |
Surface Hole Longitude: -116.591001 |
Date | Event |
---|---|
1994-09-07 | Obtained License |
1994-09-19 | Surface Casing Operation Performed |
1994-10-14 | Direction Drilling Operation Performed - Horizontal |
1994-10-23 | Production Casing Operation Performed |
1994-10-28 | Finished Drilling |
1994-10-28 | Perforation Treatment Performed - Open-Hole Completion |
1994-10-28 | Well Mode changed to Drilled and Cased |
1994-10-29 | Rig Released |
1994-11-01 | Well Log Performed |
1994-11-15 | Well Began Production |
1994-11-15 | Well Fluid changed to Crude Oil |
1994-11-15 | Well Mode changed to Pumping |
1995-03-15 | Well Fluid changed to Crude Oil |
1995-03-15 | Well Mode changed to Suspended |
1995-09-01 | Well Fluid changed to Crude Oil |
1995-09-01 | Well Mode changed to Pumping |
1996-04-01 | Well Fluid changed to Crude Oil |
1996-04-01 | Well Mode changed to Suspended |
2009-03-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-03-17 | Plug Back Performed |
2009-03-17 | Well Fluid changed to Crude Oil |
2009-03-17 | Well Mode changed to Abandoned Zone |
2009-03-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-03-19 | Perforation Treatment Performed - Jet Perforation |
2009-03-19 | Perforation Treatment Performed - Remedial Casing |
2009-03-22 | Well Abandoned |
2009-03-22 | Well Fluid changed to Crude Oil |
2009-03-22 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1994-10-14 | 2540.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-10-28 | Open Hole/Barefoot Completion | 2869.80 | 2985.00 | 0 |
2009-03-17 | Packing Device Capped w/Cement | 2700.00 | 2826.00 | 0 |
2009-03-19 | Perforation | 599.00 | 600.00 | 13 |
2009-03-19 | Remedial Casing Cementing | 599.00 | 600.00 | 0 |
2009-03-19 | Packing Device Capped w/Cement | 587.00 | 597.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 524 | 0.0 | 0.0 | 0.0 |
1995 | 2738 | 0.0 | 0.0 | 0.0 |
For data sources see[6]