If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0705112915000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.090885,"lon":-115.651011,"icon":""}]} |
Location: 00/15-29-070-11W5/0 | |
Location Alias: 00/15-29-70-11 W5M | |
Location Alias 2: 00/15-29-070-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 070 | |
Meridian: 5 | |
Range: 11 | |
Section: 29 | |
County/Municipality: Big Lakes County | |
Well Name: ACL HZ SWANH 15-29-70-11 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0437026 | |
License Date: 2011-09-21 | |
License Status: Suspension | |
Spud Date: 2011-10-15 | |
Final Drill Date: 2011-11-03 | |
Well Total Depth: 3125.00 m | |
Surface Hole Latitude: 55.090885 | |
Surface Hole Longitude: -115.651011 |
Date | Event |
---|---|
2011-09-21 | Obtained License |
2011-10-17 | Surface Casing Operation Performed |
2011-10-23 | Direction Drilling Operation Performed - Deviate |
2011-10-25 | Direction Drilling Operation Performed - Horizontal |
2011-10-27 | Intermediate Casing Operation Performed |
2011-10-29 | Well Log Performed |
2011-11-02 | Well Log Performed |
2011-11-03 | Finished Drilling |
2011-11-03 | Well Mode changed to Drilled and Cased |
2011-11-04 | Liner Casing Operation Performed |
2011-11-04 | Perforation Treatment Performed - Open-Hole Completion |
2011-11-05 | Rig Released |
2012-01-05 | Well Log Performed |
2012-01-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-26 | Well Began Production |
2012-03-26 | Well Fluid changed to Crude Oil |
2012-03-26 | Well Mode changed to Pumping |
2016-10-11 | Well Fluid changed to Crude Oil |
2016-10-11 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-10-23 | 2032.00 | Deviate (5 - 79 degrees) |
2011-10-25 | 2370.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-04 | Open Hole/Barefoot Completion | 3120.00 | 3125.00 | 0 |
2012-01-12 | Multi-Stage Fracture | 2685.50 | 2685.60 | 0 |
2012-01-12 | Multi-Stage Fracture | 2699.90 | 2700.00 | 0 |
2012-01-12 | Multi-Stage Fracture | 2735.50 | 2735.60 | 0 |
2012-01-12 | Multi-Stage Fracture | 2750.20 | 2750.30 | 0 |
2012-01-12 | Multi-Stage Fracture | 2764.60 | 2764.70 | 0 |
2012-01-12 | Multi-Stage Fracture | 2776.90 | 2777.00 | 0 |
2012-01-12 | Multi-Stage Fracture | 2814.00 | 2814.10 | 0 |
2012-01-12 | Multi-Stage Fracture | 2827.60 | 2827.70 | 0 |
2012-01-12 | Multi-Stage Fracture | 2841.70 | 2841.80 | 0 |
2012-01-12 | Multi-Stage Fracture | 2854.10 | 2854.20 | 0 |
2012-01-12 | Multi-Stage Fracture | 2495.50 | 2495.60 | 0 |
2012-01-12 | Multi-Stage Fracture | 2890.10 | 2890.20 | 0 |
2012-01-12 | Multi-Stage Fracture | 2904.00 | 2904.10 | 0 |
2012-01-12 | Multi-Stage Fracture | 2918.60 | 2918.70 | 0 |
2012-01-12 | Multi-Stage Fracture | 2932.90 | 2933.00 | 0 |
2012-01-12 | Multi-Stage Fracture | 2970.30 | 2970.40 | 0 |
2012-01-12 | Multi-Stage Fracture | 2985.00 | 2985.10 | 0 |
2012-01-12 | Multi-Stage Fracture | 2999.70 | 2999.80 | 0 |
2012-01-12 | Multi-Stage Fracture | 3014.40 | 3014.50 | 0 |
2012-01-12 | Multi-Stage Fracture | 3081.90 | 3082.00 | 0 |
2012-01-12 | Multi-Stage Fracture | 2523.10 | 2523.20 | 0 |
2012-01-12 | Multi-Stage Fracture | 2540.40 | 2540.50 | 0 |
2012-01-12 | Multi-Stage Fracture | 2587.80 | 2587.90 | 0 |
2012-01-12 | Multi-Stage Fracture | 2604.10 | 2604.20 | 0 |
2012-01-12 | Multi-Stage Fracture | 2621.60 | 2621.70 | 0 |
2012-01-12 | Multi-Stage Fracture | 2656.70 | 2656.80 | 0 |
2012-01-12 | Multi-Stage Fracture | 2670.80 | 2670.90 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 3618 | 0.0 | 0.0 | 0.0 |
2013 | 6370 | 0.0 | 0.0 | 0.0 |
2014 | 8322 | 0.0 | 0.0 | 0.0 |
2015 | 1056 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]