If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0705112909000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.090746,"lon":-115.65121,"icon":""}]} |
Location: 00/09-29-070-11W5/0 | |
Location Alias: 00/09-29-70-11 W5M | |
Location Alias 2: 00/09-29-070-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 070 | |
Meridian: 5 | |
Range: 11 | |
Section: 29 | |
County/Municipality: Big Lakes County | |
Well Name: ACL HZ SWANH 9-29-70-11 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0437011 | |
License Date: 2011-09-21 | |
License Status: Suspension | |
Spud Date: 2011-11-07 | |
Final Drill Date: 2011-11-21 | |
Well Total Depth: 3200.00 m | |
Surface Hole Latitude: 55.090746 | |
Surface Hole Longitude: -115.651210 |
Date | Event |
---|---|
2011-09-21 | Obtained License |
2011-11-09 | Surface Casing Operation Performed |
2011-11-13 | Direction Drilling Operation Performed - Deviate |
2011-11-13 | Well Log Performed |
2011-11-16 | Direction Drilling Operation Performed - Horizontal |
2011-11-16 | Well Log Performed |
2011-11-18 | Intermediate Casing Operation Performed |
2011-11-18 | Well Log Performed |
2011-11-21 | Finished Drilling |
2011-11-21 | Well Mode changed to Drilled and Cased |
2011-11-22 | Well Log Performed |
2011-11-23 | Liner Casing Operation Performed |
2011-11-23 | Perforation Treatment Performed - Open-Hole Completion |
2011-11-24 | Rig Released |
2012-01-26 | Well Began Production |
2012-01-26 | Well Fluid changed to Crude Oil |
2012-01-26 | Well Mode changed to Pumping |
2012-01-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-10-11 | Well Fluid changed to Crude Oil |
2016-10-11 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-11-13 | 1865.00 | Deviate (5 - 79 degrees) |
2011-11-16 | 2456.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-23 | Open Hole/Barefoot Completion | 3180.00 | 3200.00 | 0 |
2012-01-29 | Multi-Stage Fracture | 2581.20 | 2581.30 | 0 |
2012-01-29 | Multi-Stage Fracture | 2602.50 | 2602.60 | 0 |
2012-01-29 | Multi-Stage Fracture | 2618.20 | 2618.30 | 0 |
2012-01-29 | Multi-Stage Fracture | 2632.70 | 2632.80 | 0 |
2012-01-29 | Multi-Stage Fracture | 2647.40 | 2647.50 | 0 |
2012-01-29 | Multi-Stage Fracture | 2661.70 | 2661.80 | 0 |
2012-01-29 | Multi-Stage Fracture | 2683.10 | 2683.20 | 0 |
2012-01-29 | Multi-Stage Fracture | 2698.10 | 2698.20 | 0 |
2012-01-29 | Multi-Stage Fracture | 2712.20 | 2712.30 | 0 |
2012-01-29 | Multi-Stage Fracture | 2726.30 | 2726.40 | 0 |
2012-01-29 | Multi-Stage Fracture | 3060.20 | 3060.30 | 0 |
2012-01-29 | Multi-Stage Fracture | 2741.10 | 2741.20 | 0 |
2012-01-29 | Multi-Stage Fracture | 2761.90 | 2762.00 | 0 |
2012-01-29 | Multi-Stage Fracture | 2791.90 | 2792.00 | 0 |
2012-01-29 | Multi-Stage Fracture | 2806.30 | 2806.40 | 0 |
2012-01-29 | Multi-Stage Fracture | 2819.90 | 2820.00 | 0 |
2012-01-29 | Multi-Stage Fracture | 2834.70 | 2834.80 | 0 |
2012-01-29 | Multi-Stage Fracture | 2856.20 | 2856.30 | 0 |
2012-01-29 | Multi-Stage Fracture | 2886.30 | 2886.40 | 0 |
2012-01-29 | Multi-Stage Fracture | 2901.00 | 2901.10 | 0 |
2012-01-29 | Multi-Stage Fracture | 2915.30 | 2915.40 | 0 |
2012-01-29 | Multi-Stage Fracture | 3074.30 | 3074.40 | 0 |
2012-01-29 | Multi-Stage Fracture | 2930.00 | 2930.10 | 0 |
2012-01-29 | Multi-Stage Fracture | 2951.00 | 2951.10 | 0 |
2012-01-29 | Multi-Stage Fracture | 2966.80 | 2966.90 | 0 |
2012-01-29 | Multi-Stage Fracture | 2980.80 | 2980.90 | 0 |
2012-01-29 | Multi-Stage Fracture | 2995.50 | 2995.60 | 0 |
2012-01-29 | Multi-Stage Fracture | 3009.70 | 3009.80 | 0 |
2012-01-29 | Multi-Stage Fracture | 3031.10 | 3031.20 | 0 |
2012-01-29 | Multi-Stage Fracture | 3046.40 | 3046.50 | 0 |
2012-01-29 | Multi-Stage Fracture | 3088.80 | 3088.90 | 0 |
2012-01-29 | Multi-Stage Fracture | 3142.80 | 3142.90 | 0 |
2012-01-29 | Multi-Stage Fracture | 2521.90 | 2522.00 | 0 |
2012-01-29 | Multi-Stage Fracture | 2537.50 | 2537.60 | 0 |
2012-01-29 | Multi-Stage Fracture | 2551.80 | 2551.90 | 0 |
2012-01-29 | Multi-Stage Fracture | 2566.50 | 2566.60 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7074 | 0.0 | 0.0 | 0.0 |
2013 | 4321 | 0.0 | 0.0 | 0.0 |
2014 | 8277 | 0.0 | 0.0 | 0.0 |
2015 | 1560 | 0.0 | 0.0 | 0.0 |
For data sources see[6]