X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0705112111000

Well Details

Well ID: 0705112111000
Loading map...
Location: 00/11-21-070-11W5/0
Location Alias: 00/11-21-70-11 W5M
Location Alias 2: 00/11-21-070-11 W5/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 11
Section: 21
County/Municipality: Big Lakes County
Well Name: ACL HZ SWANH 11-21-70-11
Operator Name: Cardinal Energy Ltd.
License Number: 0438246
License Date: 2011-10-31
License Status: Issued
Spud Date: 2011-11-28
Final Drill Date: 2011-12-13
Well Total Depth: 3412.00 m
Surface Hole Latitude: 55.077716
Surface Hole Longitude: -115.600081

For data sources see[1][2]

Well History

Date Event
2011-10-31 Obtained License
2011-11-30 Surface Casing Operation Performed
2011-12-05 Direction Drilling Operation Performed - Deviate
2011-12-07 Direction Drilling Operation Performed - Horizontal
2011-12-09 Intermediate Casing Operation Performed
2011-12-10 Well Log Performed
2011-12-13 Finished Drilling
2011-12-13 Well Log Performed
2011-12-13 Well Mode changed to Drilled and Cased
2011-12-15 Liner Casing Operation Performed
2011-12-15 Perforation Treatment Performed - Open-Hole Completion
2011-12-16 Rig Released
2012-01-07 Well Log Performed
2012-02-03 Well Log Performed
2012-02-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-10 Well Began Production
2012-02-10 Well Fluid changed to Crude Oil
2012-02-10 Well Mode changed to Flowing
2012-03-09 Well Fluid changed to Crude Oil
2012-03-09 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-05 2125.00 Deviate (5 - 79 degrees)
2011-12-07 2449.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-15 Open Hole/Barefoot Completion 3408.00 3412.00 0
2012-02-09 Multi-Stage Fracture 2860.60 2860.70 0
2012-02-09 Multi-Stage Fracture 2875.00 2875.10 0
2012-02-09 Multi-Stage Fracture 2924.30 2924.40 0
2012-02-09 Multi-Stage Fracture 2939.00 2939.10 0
2012-02-09 Multi-Stage Fracture 2953.50 2953.60 0
2012-02-09 Multi-Stage Fracture 2968.00 2968.10 0
2012-02-09 Multi-Stage Fracture 3017.50 3017.60 0
2012-02-09 Multi-Stage Fracture 3031.80 3031.90 0
2012-02-09 Multi-Stage Fracture 3046.50 3046.60 0
2012-02-09 Multi-Stage Fracture 3060.90 3061.00 0
2012-02-09 Multi-Stage Fracture 2554.30 2554.40 0
2012-02-09 Multi-Stage Fracture 3112.00 3112.10 0
2012-02-09 Multi-Stage Fracture 3126.20 3126.30 0
2012-02-09 Multi-Stage Fracture 3140.20 3140.30 0
2012-02-09 Multi-Stage Fracture 3154.50 3154.60 0
2012-02-09 Multi-Stage Fracture 3191.90 3192.00 0
2012-02-09 Multi-Stage Fracture 3206.50 3206.60 0
2012-02-09 Multi-Stage Fracture 3221.20 3221.30 0
2012-02-09 Multi-Stage Fracture 3236.00 3236.10 0
2012-02-09 Multi-Stage Fracture 3287.70 3287.80 0
2012-02-09 Multi-Stage Fracture 3302.30 3302.40 0
2012-02-09 Multi-Stage Fracture 2644.40 2644.50 0
2012-02-09 Multi-Stage Fracture 3316.80 3316.90 0
2012-02-09 Multi-Stage Fracture 3329.00 3329.10 0
2012-02-09 Multi-Stage Fracture 3384.30 3384.40 0
2012-02-09 Multi-Stage Fracture 2724.40 2724.50 0
2012-02-09 Multi-Stage Fracture 2739.80 2739.90 0
2012-02-09 Multi-Stage Fracture 2753.80 2753.90 0
2012-02-09 Multi-Stage Fracture 2768.60 2768.70 0
2012-02-09 Multi-Stage Fracture 2833.70 2833.80 0
2012-02-09 Multi-Stage Fracture 2845.80 2845.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6106 0.0 0.0 0.0
2013 8051 0.0 0.0 0.0
2014 7845 0.0 0.0 0.0
2015 7952 0.0 0.0 0.0
2016 8752 0.0 0.0 0.0
2017 8713 0.0 0.0 0.0
2018 8545 0.0 0.0 0.0
2019 8365 0.0 0.0 0.0
2020 2034 0.0 0.0 0.0

For data sources see[6]

References