X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0705111604000

Well Details

Well ID: 0705111604000
Loading map...
Location: 00/04-16-070-11W5/0
Location Alias: 00/04-16-70-11 W5M
Location Alias 2: 00/04-16-070-11 W5/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 11
Section: 16
County/Municipality: Big Lakes County
Well Name: WHITEHALL CDN-SUP SWANH 4-16-70-11
Operator Name: BP Canada Energy Group ULC
License Number: 0028457
License Date: 1965-06-23
License Status: RecExempt
Spud Date: 1965-07-08
Final Drill Date: 1965-07-23
Well Total Depth: 2464.30 m
Surface Hole Latitude: 55.056040
Surface Hole Longitude: -115.625797

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-06-23 Obtained License
1965-07-23 Finished Drilling
1965-07-23 Well Mode changed to Drilled and Cased
1965-07-25 Production Casing Operation Performed
1965-08-09 Perforation Treatment Performed - Selective Jet Perforations
1965-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-08-21 Well Began Production
1965-08-21 Well Fluid changed to Crude Oil
1965-08-21 Well Mode changed to Flowing
1965-10-20 Well Fluid changed to Crude Oil
1965-10-20 Well Mode changed to Pumping
1967-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-08-17 Perforation Treatment Performed - Selective Jet Perforations
1968-08-18 Well Began Injection
1968-08-18 Well Fluid changed to Water
1968-08-18 Well Type changed to Injection
1977-10-06 Perforation Treatment Performed - Cement Squeeze
1977-10-06 Well Abandoned
1977-10-06 Well Fluid changed to Water
1977-10-06 Well Mode changed to Abandoned
1977-10-06 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-08-09 Selective Jet Perforations 2423.20 2425.60 0
1968-08-17 Selective Jet Perforations 2425.30 2426.50 0
1968-08-17 Selective Jet Perforations 2426.80 2427.10 0
1968-08-17 Selective Jet Perforations 2427.70 2428.00 0
1968-08-17 Selective Jet Perforations 2428.30 2428.60 0
1968-08-17 Selective Jet Perforations 2432.00 2432.60 0
1968-08-17 Selective Jet Perforations 2432.90 2433.20 0
1968-08-17 Selective Jet Perforations 2434.70 2435.00 0
1968-08-17 Selective Jet Perforations 2435.40 2435.70 0
1968-08-17 Acid Treatment 2418.00 2435.70 0
1977-10-06 Cement Squeeze 2418.00 2435.70 0
1965-08-09 Selective Jet Perforations 2428.30 2432.90 0
1965-08-09 Selective Jet Perforations 2436.30 2436.30 0
1965-08-10 Acid Treatment 2423.20 2436.30 0
1967-08-01 Acid Treatment 2423.20 2436.30 0
1968-08-17 Selective Jet Perforations 2418.00 2418.30 0
1968-08-17 Selective Jet Perforations 2418.60 2420.40 0
1968-08-17 Selective Jet Perforations 2420.70 2421.00 0
1968-08-17 Selective Jet Perforations 2422.90 2423.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5133 0.0 0.0 0.0
1968 5095 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0

For data sources see[5]

References