If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0705111509000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.066052,"lon":-115.59447,"icon":""}]} |
Location: 00/09-15-070-11W5/0 | |
Location Alias: 00/09-15-70-11 W5M | |
Location Alias 2: 00/09-15-070-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 070 | |
Meridian: 5 | |
Range: 11 | |
Section: 15 | |
County/Municipality: Big Lakes County | |
Well Name: ACL HZ SWANH 9-15-70-11 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0438727 | |
License Date: 2011-11-14 | |
License Status: Issued | |
Spud Date: 2012-01-04 | |
Final Drill Date: 2012-01-15 | |
Well Total Depth: 3260.00 m | |
Surface Hole Latitude: 55.066052 | |
Surface Hole Longitude: -115.594470 |
Date | Event |
---|---|
2011-11-14 | Obtained License |
2012-01-05 | Surface Casing Operation Performed |
2012-01-09 | Direction Drilling Operation Performed - Deviate |
2012-01-09 | Well Log Performed |
2012-01-11 | Direction Drilling Operation Performed - Horizontal |
2012-01-12 | Intermediate Casing Operation Performed |
2012-01-13 | Well Log Performed |
2012-01-15 | Finished Drilling |
2012-01-15 | Well Log Performed |
2012-01-15 | Well Mode changed to Drilled and Cased |
2012-01-18 | Liner Casing Operation Performed |
2012-01-18 | Perforation Treatment Performed - Open-Hole Completion |
2012-01-19 | Rig Released |
2012-02-19 | Well Log Performed |
2012-02-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-04-05 | Well Began Production |
2012-04-05 | Well Fluid changed to Crude Oil |
2012-04-05 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-04 | Horizon Drilling Inc. | 25 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-09 | 2166.00 | Deviate (5 - 79 degrees) |
2012-01-11 | 2514.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-18 | Open Hole/Barefoot Completion | 3243.00 | 3260.00 | 0 |
2012-02-22 | Multi-Stage Fracture | 2782.80 | 2782.90 | 0 |
2012-02-22 | Multi-Stage Fracture | 2794.50 | 2794.60 | 0 |
2012-02-22 | Multi-Stage Fracture | 2817.40 | 2817.50 | 0 |
2012-02-22 | Multi-Stage Fracture | 2829.10 | 2829.20 | 0 |
2012-02-22 | Multi-Stage Fracture | 2874.60 | 2874.70 | 0 |
2012-02-22 | Multi-Stage Fracture | 2886.10 | 2886.20 | 0 |
2012-02-22 | Multi-Stage Fracture | 2908.90 | 2909.00 | 0 |
2012-02-22 | Multi-Stage Fracture | 2920.40 | 2920.50 | 0 |
2012-02-22 | Multi-Stage Fracture | 2966.00 | 2966.10 | 0 |
2012-02-22 | Multi-Stage Fracture | 2977.70 | 2977.80 | 0 |
2012-02-22 | Multi-Stage Fracture | 2599.30 | 2599.40 | 0 |
2012-02-22 | Multi-Stage Fracture | 3000.80 | 3000.90 | 0 |
2012-02-22 | Multi-Stage Fracture | 3012.50 | 3012.60 | 0 |
2012-02-22 | Multi-Stage Fracture | 3058.30 | 3058.40 | 0 |
2012-02-22 | Multi-Stage Fracture | 3070.00 | 3070.10 | 0 |
2012-02-22 | Multi-Stage Fracture | 3081.70 | 3081.80 | 0 |
2012-02-22 | Multi-Stage Fracture | 3093.30 | 3093.40 | 0 |
2012-02-22 | Multi-Stage Fracture | 3138.60 | 3138.70 | 0 |
2012-02-22 | Multi-Stage Fracture | 3150.30 | 3150.40 | 0 |
2012-02-22 | Multi-Stage Fracture | 3162.00 | 3162.10 | 0 |
2012-02-22 | Multi-Stage Fracture | 3173.50 | 3173.60 | 0 |
2012-02-22 | Multi-Stage Fracture | 2622.30 | 2622.40 | 0 |
2012-02-22 | Multi-Stage Fracture | 3222.50 | 3222.60 | 0 |
2012-02-22 | Multi-Stage Fracture | 2633.80 | 2633.90 | 0 |
2012-02-22 | Multi-Stage Fracture | 2656.80 | 2656.90 | 0 |
2012-02-22 | Multi-Stage Fracture | 2702.20 | 2702.30 | 0 |
2012-02-22 | Multi-Stage Fracture | 2713.90 | 2714.00 | 0 |
2012-02-22 | Multi-Stage Fracture | 2737.00 | 2737.10 | 0 |
2012-02-22 | Multi-Stage Fracture | 2748.70 | 2748.80 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 5976 | 0.0 | 0.0 | 0.0 |
2013 | 6872 | 0.0 | 0.0 | 0.0 |
2014 | 7015 | 0.0 | 0.0 | 0.0 |
2015 | 8686 | 0.0 | 0.0 | 0.0 |
2016 | 8241 | 0.0 | 0.0 | 0.0 |
2017 | 8615 | 0.0 | 0.0 | 0.0 |
2018 | 8503 | 0.0 | 0.0 | 0.0 |
2019 | 8413 | 0.0 | 0.0 | 0.0 |
2020 | 2162 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-02-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]