X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0705101810000

Well Details

Well ID: 0705101810000
Loading map...
Location: 00/10-18-070-10W5/0
Location Alias: 00/10-18-70-10 W5M
Location Alias 2: 00/10-18-070-10 W5/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 10
Section: 18
County/Municipality: Big Lakes County
Well Name: ACL SWAN HILLS 10-18-70-10
Operator Name: Cardinal Energy Ltd.
License Number: 0027362
License Date: 1964-12-16
License Status: Suspension
Spud Date: 1964-12-21
Final Drill Date: 1965-01-08
Well Total Depth: 2301.20 m
Surface Hole Latitude: 55.063267
Surface Hole Longitude: -115.510849

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-12-16 Obtained License
1965-01-05 Production Casing Operation Performed
1965-01-08 Finished Drilling
1965-01-08 Well Mode changed to Drilled and Cased
1965-01-10 Perforation Treatment Performed - Open-Hole Completion
1965-02-04 Well Began Production
1965-02-04 Well Fluid changed to Crude Oil
1965-02-04 Well Mode changed to Flowing
1965-02-28 Well Fluid changed to Crude Oil
1965-02-28 Well Mode changed to Pumping
1988-10-04 Well Fluid changed to Crude Oil
1988-10-04 Well Mode changed to Suspended
1996-08-25 Perforation Treatment Performed - Chemical Squeeze
1996-12-15 Well Fluid changed to Crude Oil
1996-12-15 Well Mode changed to Pumping
1998-10-01 Well Fluid changed to Crude Oil
1998-10-01 Well Mode changed to Suspended
2002-03-24 Perforation Treatment Performed - Fractured
2002-04-04 Well Fluid changed to Crude Oil
2002-04-04 Well Mode changed to Pumping
2011-12-20 Well Fluid changed to Crude Oil
2011-12-20 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-01-10 Open Hole/Barefoot Completion 2275.30 2301.20 0
1996-08-25 Chemical Squeeze 2275.30 2301.20 0
2002-03-24 Fracture 2275.30 2301.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 312 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1973 620 0.0 0.0 0.0
1975 4658 0.0 0.0 0.0
1976 3907 0.0 0.0 0.0
1977 7773 0.0 0.0 0.0
1978 8568 0.0 0.0 0.0
1979 7554 0.0 0.0 0.0
1980 7826 0.0 0.0 0.0
1981 8199 0.0 0.0 0.0
1982 8563 0.0 0.0 0.0
1983 7925 0.0 0.0 0.0
1984 3874 0.0 0.0 0.0
1985 8602 0.0 0.0 0.0
1986 4884 0.0 0.0 0.0
1996 96 0.0 0.0 0.0
1997 2935 0.0 0.0 0.0
1998 527 0.0 0.0 0.0
2002 6369 0.0 0.0 0.0
2003 7663 0.0 0.0 0.0
2004 7931 0.0 0.0 0.0
2005 8378 0.0 0.0 0.0
2006 8756 0.0 0.0 0.0
2007 8750 0.0 0.0 0.0
2008 7930 0.0 0.0 0.0
2009 3747 0.0 0.0 0.0
2010 4512 0.0 0.0 0.0

For data sources see[5]

References