X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0696140101000

Well Details

Well ID: 0696140101000
Loading map...
Location: 00/01-01-069-14W6/0
Location Alias: 00/01-01-69-14 W6M
Location Alias 2: 00/01-01-069-14 W6/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 14
Section: 01
County/Municipality: County of Grande Prairie No. 1
Well Name: DAYLIGHT HZ WAPITI 1-1-69-14
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0438803
License Date: 2011-11-15
License Status: Issued
Spud Date: 2011-11-29
Final Drill Date: 2012-01-18
Well Total Depth: 3946.00 m
Surface Hole Latitude: 54.947743
Surface Hole Longitude: -119.993954

For data sources see[1][2]

Well History

Date Event
2011-11-15 Obtained License
2011-12-02 Surface Casing Operation Performed
2011-12-13 Direction Drilling Operation Performed - Horizontal
2011-12-22 Well Log Performed
2011-12-23 Well Log Performed
2011-12-28 Intermediate Casing Operation Performed
2012-01-18 Finished Drilling
2012-01-18 Well Log Performed
2012-01-18 Well Mode changed to Drilled and Cased
2012-01-20 Liner Casing Operation Performed
2012-01-21 Rig Released
2012-01-27 Well Log Performed
2012-02-10 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-10 Perforation Treatment Performed - Open-Hole Completion
2012-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-02-16 Perforation Treatment Performed - Jet Perforation
2012-02-17 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-23 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-24 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-01 Well Began Production
2012-07-01 Well Fluid changed to Gas
2012-07-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-13 2596.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-10 Open Hole/Barefoot Completion 3915.70 3946.00 0
2012-02-24 Multi-Stage Fracture 3387.40 3387.50 0
2012-02-10 Multi-Stage Fracture 3832.00 3832.10 0
2012-02-16 Perforation 3826.50 3828.00 4
2012-02-16 Acid Treatment 3826.50 3828.00 0
2012-02-17 Multi-Stage Fracture 3763.00 3763.10 0
2012-02-17 Multi-Stage Fracture 3680.50 3680.60 0
2012-02-17 Multi-Stage Fracture 3608.60 3608.70 0
2012-02-17 Multi-Stage Fracture 3538.60 3538.70 0
2012-02-23 Multi-Stage Fracture 3455.50 3455.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3220 0.0 0.0 0.0
2013 5639 0.0 0.0 0.0
2014 8115 0.0 0.0 0.0
2015 8524 0.0 0.0 0.0
2016 8170 0.0 0.0 0.0
2017 7519 0.0 0.0 0.0
2018 7730 0.0 0.0 0.0
2019 7511 0.0 0.0 0.0
2020 1991 0.0 0.0 0.0

For data sources see[6]

References