X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0696122407000

Well Details

Well ID: 0696122407000
Loading map...
Location: 00/07-24-069-12W6/0
Location Alias: 00/07-24-69-12 W6M
Location Alias 2: 00/07-24-069-12 W6/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 12
Section: 24
County/Municipality: County of Grande Prairie No. 1
Well Name: DAYLIGHT ELM 7-24-69-12
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0283793
License Date: 2003-03-03
License Status: Amended
Spud Date: 2003-10-27
Final Drill Date: 2003-12-06
Well Total Depth: 3649.00 m
Surface Hole Latitude: 54.980890
Surface Hole Longitude: -119.677219

For data sources see[1][2]

Well History

Date Event
2003-03-03 Obtained License
2003-10-30 Surface Casing Operation Performed
2003-11-12 Direction Drilling Operation Performed - Horizontal
2003-11-23 Production Casing Operation Performed
2003-12-06 Finished Drilling
2003-12-06 Perforation Treatment Performed - Open-Hole Completion
2003-12-06 Well Mode changed to Drilled and Cased
2003-12-07 Well Log Performed
2003-12-11 Rig Released
2004-02-06 Perforation Treatment Performed - Open-Hole Completion
2004-02-08 Well Log Performed
2004-02-09 Well Log Performed
2004-03-01 Perforation Treatment Performed - Fractured
2004-03-12 Well Began Production
2004-03-12 Well Fluid changed to Gas
2004-03-12 Well Mode changed to Flowing
2007-12-21 Perforation Treatment Performed - Jet Perforation
2007-12-21 Perforation Treatment Performed - Remedial Casing
2007-12-21 Well Log Performed
2008-01-02 Perforation Treatment Performed - Jet Perforation
2008-01-02 Well Log Performed
2008-01-04 Perforation Treatment Performed - Remedial Casing
2009-01-09 Well Log Performed
2009-01-10 Perforation Treatment Performed - Jet Perforation
2009-01-10 Well Log Performed
2009-01-14 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-11-12 2325.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-12-06 Open Hole/Barefoot Completion 2648.00 3649.00 0
2009-01-14 Fracture 2401.00 2402.00 0
2009-01-14 Fracture 2427.00 2428.00 0
2004-02-06 Open Hole/Barefoot Completion 2648.00 3649.00 0
2004-03-01 Fracture 2648.00 3649.00 0
2007-12-21 Perforation 875.00 876.00 99
2007-12-21 Remedial Casing Cementing 875.00 876.00 0
2008-01-02 Perforation 407.00 408.00 99
2008-01-04 Remedial Casing Cementing 407.00 408.00 0
2009-01-10 Perforation 2401.00 2402.00 4
2009-01-10 Perforation 2427.00 2428.00 4

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 5122 0.0 0.0 0.0
2005 8523 0.0 0.0 0.0
2006 7031 0.0 0.0 0.0
2007 7664 0.0 0.0 0.0
2008 7159 0.0 0.0 0.0
2009 8135 0.0 0.0 0.0
2010 8711 0.0 0.0 0.0
2011 8736 0.0 0.0 0.0
2012 8759 0.0 0.0 0.0
2013 8615 0.0 0.0 0.0
2014 8423 0.0 0.0 0.0
2015 8687 0.0 0.0 0.0
2016 8401 0.0 0.0 0.0
2017 8327 0.0 0.0 0.0
2018 8088 0.0 0.0 0.0
2019 7680 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[6]

References