If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0696091502000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.980924,"lon":-119.2961,"icon":""}]} |
Location: 00/02-15-069-09W6/0 | |
Location Alias: 00/02-15-69-09 W6M | |
Location Alias 2: 00/02-15-069-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 6 | |
Range: 09 | |
Section: 15 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: SDEL ET AL HZ ELM 2-15-69-9 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0444123 | |
License Date: 2012-02-13 | |
License Status: Issued | |
Spud Date: 2012-03-05 | |
Final Drill Date: 2012-04-26 | |
Well Total Depth: 4460.00 m | |
Surface Hole Latitude: 54.980924 | |
Surface Hole Longitude: -119.296100 |
Date | Event |
---|---|
2012-02-13 | Obtained License |
2012-03-08 | Surface Casing Operation Performed |
2012-03-17 | Direction Drilling Operation Performed - Deviate |
2012-03-17 | Well Log Performed |
2012-03-24 | Well Log Performed |
2012-03-25 | Intermediate Casing Operation Performed |
2012-03-28 | Direction Drilling Operation Performed - Horizontal |
2012-04-02 | Well Log Performed |
2012-04-26 | Finished Drilling |
2012-04-26 | Well Log Performed |
2012-04-26 | Well Mode changed to Drilled and Cased |
2012-04-27 | Well Log Performed |
2012-05-01 | Liner Casing Operation Performed |
2012-05-02 | Rig Released |
2012-07-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-03 | Perforation Treatment Performed - Open-Hole Completion |
2012-07-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-08 | Well Log Performed |
2012-11-01 | Well Began Production |
2012-11-01 | Well Fluid changed to Gas |
2012-11-01 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-03-05 | Precision Drilling Corporation | 287 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-03-17 | 2459.00 | Deviate (5 - 79 degrees) |
2012-03-28 | 2889.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-07-03 | Open Hole/Barefoot Completion | 4456.00 | 4460.00 | 0 |
2012-07-05 | Multi-Stage Fracture | 3589.20 | 3589.30 | 0 |
2012-07-05 | Multi-Stage Fracture | 3489.30 | 3489.40 | 0 |
2012-07-05 | Multi-Stage Fracture | 3388.50 | 3388.60 | 0 |
2012-07-05 | Multi-Stage Fracture | 3287.20 | 3287.30 | 0 |
2012-07-06 | Multi-Stage Fracture | 3175.20 | 3175.30 | 0 |
2012-07-06 | Multi-Stage Fracture | 3075.30 | 3075.40 | 0 |
2012-07-06 | Multi-Stage Fracture | 2975.40 | 2975.50 | 0 |
2012-07-06 | Multi-Stage Fracture | 2860.60 | 2860.70 | 0 |
2012-07-03 | Multi-Stage Fracture | 4431.50 | 4431.60 | 0 |
2012-07-03 | Multi-Stage Fracture | 4326.30 | 4326.40 | 0 |
2012-07-03 | Multi-Stage Fracture | 4223.90 | 4224.00 | 0 |
2012-07-04 | Multi-Stage Fracture | 4112.70 | 4112.80 | 0 |
2012-07-04 | Multi-Stage Fracture | 4012.30 | 4012.40 | 0 |
2012-07-04 | Multi-Stage Fracture | 3900.10 | 3900.20 | 0 |
2012-07-05 | Multi-Stage Fracture | 3799.70 | 3799.80 | 0 |
2012-07-05 | Multi-Stage Fracture | 3700.40 | 3700.50 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1144 | 0.0 | 0.0 | 0.0 |
2013 | 3624 | 0.0 | 0.0 | 0.0 |
2014 | 8556 | 0.0 | 0.0 | 0.0 |
2015 | 7407 | 0.0 | 0.0 | 0.0 |
2016 | 3358 | 0.0 | 0.0 | 0.0 |
2017 | 6023 | 0.0 | 0.0 | 0.0 |
2018 | 8231 | 0.0 | 0.0 | 0.0 |
2019 | 7455 | 0.0 | 0.0 | 0.0 |
2020 | 1715 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-05-02 | No Incident Encountered | 0.00 | 0.00 |
2012-07-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]