X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0696091304002

Well Details

Well ID: 0696091304002
Loading map...
Location: 00/04-13-069-09W6/2
Location Alias: 00/04-13-69-09 W6M
Location Alias 2: 00/04-13-069-09 W6/02
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 09
Section: 13
County/Municipality: Municipal District of Greenview No. 16
Well Name: SINOPEC A ELM 4-13-69-9
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0480716
License Date: 2016-10-12
License Status: Amended
Spud Date: 2016-11-29
Final Drill Date: 2017-01-09
Well Total Depth: 5055.00 m
Surface Hole Latitude: 54.951665
Surface Hole Longitude: -119.218294

For data sources see[1][2]

Well History

Date Event
2016-10-12 Obtained License
2016-11-30 Intermediate Casing Operation Performed
2016-11-30 Surface Casing Operation Performed
2016-12-14 Direction Drilling Operation Performed - Horizontal
2016-12-17 Well Log Performed
2016-12-18 Intermediate Casing Operation Performed
2017-01-09 Finished Drilling
2017-01-09 Well Log Performed
2017-01-09 Well Mode changed to Drilled and Cased
2017-01-15 Liner Casing Operation Performed
2017-01-15 Perforation Treatment Performed - Open-Hole Completion
2017-01-15 Rig Released
2017-01-29 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-29 Perforation Treatment Performed - Open-Hole Completion
2017-01-30 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-31 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-09 Well Fluid changed to Gas
2017-02-09 Well Mode changed to Testing
2017-03-15 Well Began Production
2017-03-15 Well Fluid changed to Gas
2017-03-15 Well Mode changed to Flowing
2018-02-01 Well Fluid changed to Gas
2018-02-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2016-12-14 2368.58 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-15 Open Hole/Barefoot Completion 5043.00 5055.00 0
2017-01-30 Multi-Stage Fracture 4289.20 4289.30 0
2017-01-30 Multi-Stage Fracture 4191.50 4191.60 0
2017-01-30 Multi-Stage Fracture 4094.30 4094.40 0
2017-01-30 Multi-Stage Fracture 3997.20 3997.30 0
2017-01-30 Multi-Stage Fracture 3900.90 3901.00 0
2017-01-30 Multi-Stage Fracture 3803.30 3803.40 0
2017-01-31 Multi-Stage Fracture 3706.00 3706.10 0
2017-01-31 Multi-Stage Fracture 3608.60 3608.70 0
2017-01-31 Multi-Stage Fracture 3511.90 3512.00 0
2017-01-31 Multi-Stage Fracture 3414.90 3415.00 0
2017-01-29 Open Hole/Barefoot Completion 5043.00 5055.00 0
2017-01-31 Multi-Stage Fracture 3317.30 3317.40 0
2017-01-31 Multi-Stage Fracture 3220.30 3220.40 0
2017-01-31 Multi-Stage Fracture 3122.70 3122.80 0
2017-01-31 Multi-Stage Fracture 3025.10 3025.20 0
2017-01-31 Multi-Stage Fracture 2928.20 2928.30 0
2017-01-31 Multi-Stage Fracture 2832.10 2832.20 0
2017-01-29 Multi-Stage Fracture 4971.10 4971.20 0
2017-01-30 Multi-Stage Fracture 4874.20 4874.30 0
2017-01-30 Multi-Stage Fracture 4776.40 4776.50 0
2017-01-30 Multi-Stage Fracture 4678.60 4678.70 0
2017-01-30 Multi-Stage Fracture 4581.60 4581.70 0
2017-01-30 Multi-Stage Fracture 4484.00 4484.10 0
2017-01-30 Multi-Stage Fracture 4386.50 4386.60 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-01-29 2017-01-31 2,791 16,857 N/A
2 2017-01-30 2017-01-31 2,791 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 85.2828 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 11.0349 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 2.4108 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0105 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0105 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0739 N/A
DWP-959 Calfrac Demulsifier Methanol 67-56-1 100 0.0793 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0793 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0933 N/A
2 30/50 Prime Plus Calfrac Quartz 14808-60-7 100 1.2959 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-01-29 2017-01-30 Surface Water - Runoff 6910
2017-01-31 2017-01-31 Surface Water - Runoff 3432
2017-01-31 2017-01-31 Surface Water - Runoff 1022
2017-01-30 2017-01-31 Surface Water - Runoff 6020

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 3600 0.0 0.0 0.0
2018 6930 0.0 0.0 0.0
2019 4030 0.0 0.0 0.0
2020 766 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-15 No Incident Encountered 0.00 0.00
2017-02-12 No Incident Encountered 0.00 0.00
2018-03-20 No Incident Encountered 0.00 0.00

For data sources see[9]

References