X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0696091005000

Well Details

Well ID: 0696091005000
Loading map...
Location: 00/05-10-069-09W6/0
Location Alias: 00/05-10-69-09 W6M
Location Alias 2: 00/05-10-069-09 W6/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 09
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: SDEL HZ ELM 5-10-69-9
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0445573
License Date: 2012-05-01
License Status: Issued
Spud Date: 2012-05-08
Final Drill Date: 2012-06-20
Well Total Depth: 4775.00 m
Surface Hole Latitude: 54.953135
Surface Hole Longitude: -119.265350

For data sources see[1][2]

Well History

Date Event
2012-05-01 Obtained License
2012-05-09 Surface Casing Operation Performed
2012-05-10 Direction Drilling Operation Performed - Deviate
2012-05-17 Well Log Performed
2012-05-25 Intermediate Casing Operation Performed
2012-05-25 Well Log Performed
2012-05-26 Direction Drilling Operation Performed - Horizontal
2012-06-20 Finished Drilling
2012-06-20 Well Log Performed
2012-06-20 Well Mode changed to Drilled and Cased
2012-06-22 Liner Casing Operation Performed
2012-06-23 Rig Released
2012-07-17 Well Log Performed
2012-07-26 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-26 Perforation Treatment Performed - Open-Hole Completion
2012-07-27 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-28 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-01 Well Log Performed
2012-08-10 Well Log Performed
2012-08-21 Well Began Production
2012-08-21 Well Fluid changed to Gas
2012-08-21 Well Mode changed to Flowing
2018-04-01 Well Fluid changed to Gas
2018-04-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-05-08 Precision Drilling Corporation 508 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-05-10 695.30 Deviate (5 - 79 degrees)
2012-05-26 2920.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-26 Open Hole/Barefoot Completion 4770.00 4775.00 0
2012-07-28 Multi-Stage Fracture 3925.10 3925.20 0
2012-07-28 Multi-Stage Fracture 3825.30 3825.40 0
2012-07-28 Multi-Stage Fracture 3711.50 3711.60 0
2012-07-28 Multi-Stage Fracture 3611.60 3611.70 0
2012-07-28 Multi-Stage Fracture 3499.20 3499.30 0
2012-07-28 Multi-Stage Fracture 3398.90 3399.00 0
2012-07-28 Multi-Stage Fracture 3285.80 3285.90 0
2012-07-28 Multi-Stage Fracture 3186.20 3186.30 0
2012-07-28 Multi-Stage Fracture 3085.70 3085.80 0
2012-07-28 Multi-Stage Fracture 2972.80 2972.90 0
2012-07-26 Multi-Stage Fracture 4758.40 4758.50 0
2012-07-27 Multi-Stage Fracture 4666.00 4666.10 0
2012-07-27 Multi-Stage Fracture 4553.50 4553.60 0
2012-07-27 Multi-Stage Fracture 4452.80 4452.90 0
2012-07-27 Multi-Stage Fracture 4352.20 4352.30 0
2012-07-27 Multi-Stage Fracture 4238.90 4239.00 0
2012-07-27 Multi-Stage Fracture 4138.80 4138.90 0
2012-07-27 Multi-Stage Fracture 4025.40 4025.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1486 0.0 0.0 0.0
2013 7912 0.0 0.0 0.0
2014 8559 0.0 0.0 0.0
2015 8724 0.0 0.0 0.0
2016 7049 0.0 0.0 0.0
2017 6382 0.0 0.0 0.0
2018 7974 0.0 0.0 0.0
2019 7246 0.0 0.0 0.0
2020 1251 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-23 No Incident Encountered 0.00 0.00
2012-08-24 No Incident Encountered 0.00 0.00

For data sources see[8]

References