If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0696091005000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.953135,"lon":-119.26535,"icon":""}]} |
Location: 00/05-10-069-09W6/0 | |
Location Alias: 00/05-10-69-09 W6M | |
Location Alias 2: 00/05-10-069-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 6 | |
Range: 09 | |
Section: 10 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: SDEL HZ ELM 5-10-69-9 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0445573 | |
License Date: 2012-05-01 | |
License Status: Issued | |
Spud Date: 2012-05-08 | |
Final Drill Date: 2012-06-20 | |
Well Total Depth: 4775.00 m | |
Surface Hole Latitude: 54.953135 | |
Surface Hole Longitude: -119.265350 |
Date | Event |
---|---|
2012-05-01 | Obtained License |
2012-05-09 | Surface Casing Operation Performed |
2012-05-10 | Direction Drilling Operation Performed - Deviate |
2012-05-17 | Well Log Performed |
2012-05-25 | Intermediate Casing Operation Performed |
2012-05-25 | Well Log Performed |
2012-05-26 | Direction Drilling Operation Performed - Horizontal |
2012-06-20 | Finished Drilling |
2012-06-20 | Well Log Performed |
2012-06-20 | Well Mode changed to Drilled and Cased |
2012-06-22 | Liner Casing Operation Performed |
2012-06-23 | Rig Released |
2012-07-17 | Well Log Performed |
2012-07-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-26 | Perforation Treatment Performed - Open-Hole Completion |
2012-07-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-01 | Well Log Performed |
2012-08-10 | Well Log Performed |
2012-08-21 | Well Began Production |
2012-08-21 | Well Fluid changed to Gas |
2012-08-21 | Well Mode changed to Flowing |
2018-04-01 | Well Fluid changed to Gas |
2018-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-05-08 | Precision Drilling Corporation | 508 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-05-10 | 695.30 | Deviate (5 - 79 degrees) |
2012-05-26 | 2920.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-07-26 | Open Hole/Barefoot Completion | 4770.00 | 4775.00 | 0 |
2012-07-28 | Multi-Stage Fracture | 3925.10 | 3925.20 | 0 |
2012-07-28 | Multi-Stage Fracture | 3825.30 | 3825.40 | 0 |
2012-07-28 | Multi-Stage Fracture | 3711.50 | 3711.60 | 0 |
2012-07-28 | Multi-Stage Fracture | 3611.60 | 3611.70 | 0 |
2012-07-28 | Multi-Stage Fracture | 3499.20 | 3499.30 | 0 |
2012-07-28 | Multi-Stage Fracture | 3398.90 | 3399.00 | 0 |
2012-07-28 | Multi-Stage Fracture | 3285.80 | 3285.90 | 0 |
2012-07-28 | Multi-Stage Fracture | 3186.20 | 3186.30 | 0 |
2012-07-28 | Multi-Stage Fracture | 3085.70 | 3085.80 | 0 |
2012-07-28 | Multi-Stage Fracture | 2972.80 | 2972.90 | 0 |
2012-07-26 | Multi-Stage Fracture | 4758.40 | 4758.50 | 0 |
2012-07-27 | Multi-Stage Fracture | 4666.00 | 4666.10 | 0 |
2012-07-27 | Multi-Stage Fracture | 4553.50 | 4553.60 | 0 |
2012-07-27 | Multi-Stage Fracture | 4452.80 | 4452.90 | 0 |
2012-07-27 | Multi-Stage Fracture | 4352.20 | 4352.30 | 0 |
2012-07-27 | Multi-Stage Fracture | 4238.90 | 4239.00 | 0 |
2012-07-27 | Multi-Stage Fracture | 4138.80 | 4138.90 | 0 |
2012-07-27 | Multi-Stage Fracture | 4025.40 | 4025.50 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1486 | 0.0 | 0.0 | 0.0 |
2013 | 7912 | 0.0 | 0.0 | 0.0 |
2014 | 8559 | 0.0 | 0.0 | 0.0 |
2015 | 8724 | 0.0 | 0.0 | 0.0 |
2016 | 7049 | 0.0 | 0.0 | 0.0 |
2017 | 6382 | 0.0 | 0.0 | 0.0 |
2018 | 7974 | 0.0 | 0.0 | 0.0 |
2019 | 7246 | 0.0 | 0.0 | 0.0 |
2020 | 1251 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-06-23 | No Incident Encountered | 0.00 | 0.00 |
2012-08-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]