X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0696080602000

Well Details

Well ID: 0696080602000
Loading map...
Location: 00/02-06-069-08W6/0
Location Alias: 00/02-06-69-08 W6M
Location Alias 2: 00/02-06-069-08 W6/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 08
Section: 06
County/Municipality: Municipal District of Greenview No. 16
Well Name: DAYLIGHT HZ ELM 2-6-69-8
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0434457
License Date: 2011-06-17
License Status: Issued
Spud Date: 2011-07-24
Final Drill Date: 2011-09-25
Well Total Depth: 4401.00 m
Surface Hole Latitude: 54.951665
Surface Hole Longitude: -119.218762

For data sources see[1][2]

Well History

Date Event
2011-06-17 Obtained License
2011-07-24 Well Log Performed
2011-07-27 Surface Casing Operation Performed
2011-08-10 Direction Drilling Operation Performed - Horizontal
2011-08-27 Well Log Performed
2011-08-28 Intermediate Casing Operation Performed
2011-09-11 Well Log Performed
2011-09-25 Finished Drilling
2011-09-25 Well Mode changed to Drilled and Cased
2011-09-27 Well Log Performed
2011-09-29 Liner Casing Operation Performed
2011-09-29 Well Log Performed
2011-10-02 Rig Released
2011-11-05 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-05 Perforation Treatment Performed - Open-Hole Completion
2011-11-09 Well Log Performed
2011-11-15 Well Log Performed
2011-11-17 Well Log Performed
2011-11-18 Perforation Treatment Performed - Jet Perforation
2011-11-18 Well Log Performed
2011-11-19 Well Log Performed
2011-11-21 Perforation Treatment Performed - Remedial Casing
2011-11-22 Well Log Performed
2011-11-23 Well Log Performed
2011-11-24 Perforation Treatment Performed - Jet Perforation
2011-11-24 Well Log Performed
2011-11-25 Perforation Treatment Performed - Remedial Casing
2011-11-25 Well Log Performed
2011-11-28 Perforation Treatment Performed - Jet Perforation
2011-11-28 Perforation Treatment Performed - Remedial Casing
2011-11-28 Well Log Performed
2011-12-10 Well Began Production
2011-12-10 Well Fluid changed to Gas
2011-12-10 Well Mode changed to Flowing
2012-06-07 Well Log Performed
2012-06-09 Perforation Treatment Performed - Jet Perforation
2012-06-09 Well Log Performed
2012-06-10 Perforation Treatment Performed - Remedial Casing
2012-06-12 Well Log Performed
2012-06-13 Perforation Treatment Performed - Jet Perforation
2012-06-13 Well Log Performed
2012-06-15 Well Log Performed
2012-06-20 Perforation Treatment Performed - Remedial Casing
2012-06-20 Well Log Performed
2012-06-26 Perforation Treatment Performed - Jet Perforation
2012-06-26 Well Log Performed
2012-06-28 Perforation Treatment Performed - Remedial Casing
2012-11-09 Well Log Performed
2012-11-13 Well Log Performed
2012-11-17 Well Log Performed
2012-11-20 Perforation Treatment Performed - Jet Perforation
2012-11-20 Well Log Performed
2012-11-22 Perforation Treatment Performed - Remedial Casing
2012-11-23 Perforation Treatment Performed - Jet Perforation
2012-11-23 Well Log Performed
2012-11-24 Perforation Treatment Performed - Remedial Casing
2012-11-25 Perforation Treatment Performed - Jet Perforation
2012-11-25 Well Log Performed
2012-11-26 Perforation Treatment Performed - Remedial Casing
2012-11-28 Well Log Performed
2012-11-30 Perforation Treatment Performed - Jet Perforation
2012-11-30 Well Log Performed
2012-12-01 Perforation Treatment Performed - Remedial Casing
2012-12-06 Well Log Performed
2012-12-08 Perforation Treatment Performed - Jet Perforation
2012-12-08 Well Log Performed
2012-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-12-10 Perforation Treatment Performed - Remedial Casing
2013-07-04 Well Log Performed
2013-07-24 Perforation Treatment Performed - Jet Perforation
2013-07-24 Well Log Performed
2013-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-07-29 Well Log Performed
2013-07-31 Perforation Treatment Performed - Jet Perforation
2013-07-31 Well Log Performed
2013-08-08 Well Log Performed
2013-08-18 Perforation Treatment Performed - Casing Patch (Over Perfs)
2013-08-18 Perforation Treatment Performed - Jet Perforation
2013-08-21 Well Log Performed
2013-08-25 Perforation Treatment Performed - Casing Patch (Over Perfs)
2013-08-25 Perforation Treatment Performed - Jet Perforation
2013-08-25 Well Log Performed
2013-08-27 Perforation Treatment Performed - Casing Patch (Over Perfs)
2013-10-02 Well Log Performed
2013-10-06 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-10 2390.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-05 Open Hole/Barefoot Completion 4397.00 4401.00 0
2011-11-05 Multi-Stage Fracture 3579.30 3580.10 0
2011-11-05 Multi-Stage Fracture 3488.00 3488.80 0
2011-11-05 Multi-Stage Fracture 3382.00 3382.90 0
2011-11-05 Multi-Stage Fracture 3275.40 3276.20 0
2011-11-05 Multi-Stage Fracture 3183.70 3184.50 0
2011-11-05 Multi-Stage Fracture 3079.20 3080.00 0
2011-11-05 Multi-Stage Fracture 2928.30 2929.10 0
2011-11-18 Perforation 1955.00 1955.60 99
2011-11-21 Remedial Casing Cementing 1955.00 1955.60 0
2011-11-24 Perforation 1520.00 1520.60 99
2011-11-05 Multi-Stage Fracture 4373.20 4374.50 0
2011-11-25 Remedial Casing Cementing 1520.00 1520.60 0
2011-11-28 Perforation 1365.00 1365.60 99
2011-11-28 Remedial Casing Cementing 1365.00 1365.60 0
2012-06-09 Perforation 1955.00 1956.00 14
2012-06-10 Remedial Casing Cementing 1955.00 1956.00 0
2012-06-13 Perforation 946.00 947.00 72
2012-06-20 Remedial Casing Cementing 946.00 947.00 0
2012-06-26 Perforation 850.00 850.60 99
2012-06-28 Remedial Casing Cementing 850.00 850.60 0
2012-11-20 Perforation 1365.00 1365.60 20
2011-11-05 Multi-Stage Fracture 4274.50 4275.30 0
2012-11-22 Remedial Casing Cementing 1365.00 1365.60 0
2012-11-23 Perforation 946.00 947.00 20
2012-11-24 Remedial Casing Cementing 946.00 947.00 0
2012-11-25 Perforation 850.00 850.60 20
2012-11-26 Remedial Casing Cementing 850.00 850.60 0
2012-11-30 Perforation 710.50 711.50 20
2012-12-01 Remedial Casing Cementing 710.50 711.50 0
2012-12-08 Perforation 710.50 711.50 20
2012-12-09 Acid Treatment 710.50 711.50 0
2012-12-10 Remedial Casing Cementing 710.50 711.50 0
2011-11-05 Multi-Stage Fracture 4169.60 4170.40 0
2013-07-24 Perforation 946.00 947.00 17
2013-07-24 Perforation 850.00 851.00 17
2013-07-25 Acid Treatment 850.00 947.00 0
2013-07-31 Perforation 710.50 711.50 17
2013-08-18 Perforation 1955.00 1956.00 99
2013-08-18 Casing Patch 1955.00 1956.00 0
2013-08-25 Perforation 1520.00 1520.60 99
2013-08-25 Casing Patch 1520.00 1520.60 0
2013-08-25 Perforation 1365.50 1365.60 99
2013-08-25 Casing Patch 1365.50 1365.60 0
2011-11-05 Multi-Stage Fracture 4092.80 4093.60 0
2013-08-25 Casing Patch 946.00 947.00 0
2013-08-27 Casing Patch 850.00 851.00 0
2013-08-27 Casing Patch 710.50 711.50 0
2011-11-05 Multi-Stage Fracture 3987.40 3988.20 0
2011-11-05 Multi-Stage Fracture 3882.40 3883.20 0
2011-11-05 Multi-Stage Fracture 3791.40 3792.20 0
2011-11-05 Multi-Stage Fracture 3685.20 3686.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 744 0.0 0.0 0.0
2012 4629 0.0 0.0 0.0
2013 4228 0.0 0.0 0.0
2014 7857 0.0 0.0 0.0
2015 6486 0.0 0.0 0.0
2016 6688 0.0 0.0 0.0
2017 5326 0.0 0.0 0.0
2018 6557 0.0 0.0 0.0
2019 4371 0.0 0.0 0.0
2020 1656 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-13 No Incident Encountered 0.00 0.00
2013-02-02 No Incident Encountered 0.00 0.00
2013-08-27 No Incident Encountered 0.00 0.00

For data sources see[7]

References