X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695210811000

Well Details

Well ID: 0695210811000
Loading map...
Location: 00/11-08-069-21W5/0
Location Alias: 00/11-08-69-21 W5M
Location Alias 2: 00/11-08-069-21 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 21
Section: 08
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRIAD STURLS IN 11-8-69-21
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0015875
License Date: 1958-09-08
License Status: RecCertified
Spud Date: 1958-09-14
Final Drill Date: 1958-09-27
Well Total Depth: 1505.70 m
Surface Hole Latitude: 54.960866
Surface Hole Longitude: -117.168799

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-09-08 Obtained License
1958-09-26 Drill Stem Test Performed
1958-09-27 Drill Stem Test Performed
1958-09-27 Finished Drilling
1958-09-27 Well Mode changed to Drilled and Cased
1958-09-28 Production Casing Operation Performed
1958-09-29 Perforation Treatment Performed - Bullet Perforation
1958-10-01 Perforation Treatment Performed - Cement Squeeze
1958-10-02 Drill Stem Test Performed
1958-10-02 Perforation Treatment Performed - Bullet Perforation
1958-10-02 Perforation Treatment Performed - Cement Squeeze
1958-10-04 Perforation Treatment Performed - Bullet Perforation
1958-10-04 Perforation Treatment Performed - Fractured
1958-10-07 Well Began Production
1958-10-07 Well Fluid changed to Crude Oil
1958-10-07 Well Mode changed to Flowing
1959-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-09-10 Perforation Treatment Performed - Bullet Perforation
1959-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-09-14 Perforation Treatment Performed - Fractured
1959-09-28 Well Fluid changed to Crude Oil
1959-09-28 Well Mode changed to Pumping
1960-05-25 Well Fluid changed to Crude Oil
1960-05-25 Well Mode changed to Suspended
1960-10-01 Well Began Injection
1960-10-01 Well Fluid changed to Water
1960-10-01 Well Type changed to Disposal
1980-05-01 Perforation Treatment Performed - Cement Plug
1980-05-01 Well Abandoned
1980-05-01 Well Fluid changed to Water
1980-05-01 Well Mode changed to Abandoned
1980-05-01 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-09-29 Bullet Perforation 1492.00 1492.90 13
1959-09-14 Fracture 1486.80 1487.70 0
1980-05-01 Cement Plug 387.00 1463.60 0
1958-10-01 Cement Squeeze 1492.00 1492.90 0
1958-10-02 Bullet Perforation 1489.30 1490.20 13
1958-10-02 Cement Squeeze 1489.30 1490.20 0
1958-10-04 Bullet Perforation 1483.80 1485.60 13
1958-10-04 Fracture 1483.80 1485.60 0
1959-09-08 Acid Treatment 1483.80 1485.60 0
1959-09-10 Bullet Perforation 1486.80 1487.70 13
1959-09-13 Acid Treatment 1486.80 1487.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0

For data sources see[5]

References