X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695112310000

Well Details

Well ID: 0695112310000
Loading map...
Location: 00/10-23-069-11W5/0
Location Alias: 00/10-23-69-11 W5M
Location Alias 2: 00/10-23-069-11 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 11
Section: 23
County/Municipality: Big Lakes County
Well Name: ACL SWANH 10-23-69-11
Operator Name: Cardinal Energy Ltd.
License Number: 0030777
License Date: 1966-08-04
License Status: Suspension
Spud Date: 1966-08-16
Final Drill Date: 1966-08-30
Well Total Depth: 2381.10 m
Surface Hole Latitude: 54.990030
Surface Hole Longitude: -115.562398

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-08-04 Obtained License
1966-08-30 Finished Drilling
1966-08-30 Well Mode changed to Drilled and Cased
1966-09-01 Production Casing Operation Performed
1966-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-09-02 Perforation Treatment Performed - Selective Bullet Perforations
1966-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-09-06 Well Began Production
1966-09-06 Well Fluid changed to Crude Oil
1966-09-06 Well Mode changed to Flowing
1966-10-28 Well Fluid changed to Crude Oil
1966-10-28 Well Mode changed to Pumping
1994-07-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-07-06 Plug Back Performed
1994-07-06 Well Fluid changed to Crude Oil
1994-07-06 Well Mode changed to Abandoned and Whipstocked
1998-03-05 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-09-02 Selective Bullet Perforations 2341.20 2341.80 0
1966-09-02 Selective Bullet Perforations 2361.30 2361.30 0
1966-09-02 Acid Treatment 2341.20 2361.30 0
1966-09-03 Acid Treatment 2341.20 2361.30 0
1994-07-06 Packing Device Capped w/Cement 2322.00 2330.00 0
1966-09-02 Selective Bullet Perforations 2342.40 2343.90 0
1966-09-02 Selective Bullet Perforations 2344.50 2347.30 0
1966-09-02 Selective Bullet Perforations 2347.60 2347.90 0
1966-09-02 Selective Bullet Perforations 2352.40 2353.40 0
1966-09-02 Selective Bullet Perforations 2354.00 2354.90 0
1966-09-02 Selective Bullet Perforations 2357.00 2357.60 0
1966-09-02 Selective Bullet Perforations 2358.20 2359.20 0
1966-09-02 Selective Bullet Perforations 2359.80 2360.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 2200 0.0 0.0 0.0
1968 1872 0.0 0.0 0.0
1969 8759 0.0 0.0 0.0
1970 8425 0.0 0.0 0.0
1971 7355 0.0 0.0 0.0
1972 8612 0.0 0.0 0.0
1973 8554 0.0 0.0 0.0
1974 7605 0.0 0.0 0.0
1975 5211 0.0 0.0 0.0
1976 8705 0.0 0.0 0.0
1977 7565 0.0 0.0 0.0
1978 8004 0.0 0.0 0.0
1979 7371 0.0 0.0 0.0
1980 8149 0.0 0.0 0.0
1981 8472 0.0 0.0 0.0
1982 8334 0.0 0.0 0.0
1983 8335 0.0 0.0 0.0
1984 6984 0.0 0.0 0.0
1985 8353 0.0 0.0 0.0
1986 8259 0.0 0.0 0.0
1987 8638 0.0 0.0 0.0
1988 8276 0.0 0.0 0.0
1989 8225 0.0 0.0 0.0
1990 8507 0.0 0.0 0.0
1991 7923 0.0 0.0 0.0
1992 6594 0.0 0.0 0.0
1993 6125 0.0 0.0 0.0
1994 3553 0.0 0.0 0.0

For data sources see[5]

References