X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695111207000

Well Details

Well ID: 0695111207000
Loading map...
Location: 00/07-12-069-11W5/0
Location Alias: 00/07-12-69-11 W5M
Location Alias 2: 00/07-12-069-11 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 11
Section: 12
County/Municipality: Big Lakes County
Well Name: ACL SWANH 7-12-69-11
Operator Name: Cardinal Energy Ltd.
License Number: 0123830
License Date: 1986-09-08
License Status: Abandoned
Spud Date: 1986-09-09
Final Drill Date: 1986-09-19
Well Total Depth: 2451.00 m
Surface Hole Latitude: 54.957491
Surface Hole Longitude: -115.536539

For data sources see[1][2]

Well History

Date Event
1986-09-08 Obtained License
1986-09-09 Surface Casing Operation Performed
1986-09-19 Finished Drilling
1986-09-19 Well Mode changed to Drilled and Cased
1986-09-20 Well Log Performed
1986-09-21 Well Log Performed
1986-09-22 Production Casing Operation Performed
1986-09-22 Rig Released
1986-10-15 Well Log Performed
1986-10-19 Perforation Treatment Performed - Jet Perforation
1986-10-20 Perforation Treatment Performed - Fractured
1986-11-01 Well Began Production
1986-11-01 Well Fluid changed to Crude Oil
1986-11-01 Well Mode changed to Pumping
1987-06-20 Well Log Performed
2003-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-09-10 Plug Back Performed
2003-09-10 Well Fluid changed to Crude Oil
2003-09-10 Well Mode changed to Abandoned Zone
2008-02-26 Well Log Performed
2008-02-29 Well Log Performed
2008-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-01 Well Log Performed
2008-03-02 Perforation Treatment Performed - Jet Perforation
2008-03-02 Perforation Treatment Performed - Remedial Casing
2008-03-02 Well Log Performed
2008-03-03 Perforation Treatment Performed - Cement Plug
2008-03-03 Perforation Treatment Performed - Jet Perforation
2008-03-03 Well Log Performed
2008-03-04 Perforation Treatment Performed - Jet Perforation
2008-03-05 Perforation Treatment Performed - Remedial Casing
2008-03-05 Well Log Performed
2008-03-06 Perforation Treatment Performed - Jet Perforation
2008-03-07 Perforation Treatment Performed - Cement Plug
2008-03-07 Well Log Performed
2008-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-08 Perforation Treatment Performed - Jet Perforation
2008-03-08 Perforation Treatment Performed - Remedial Casing
2008-03-08 Well Log Performed
2008-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-09 Perforation Treatment Performed - Jet Perforation
2008-03-09 Perforation Treatment Performed - Remedial Casing
2008-03-11 Well Abandoned
2008-03-11 Well Fluid changed to Crude Oil
2008-03-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-10-19 Perforation 2420.00 2422.00 13
2008-03-01 Packing Device Capped w/Cement 1009.00 1017.00 0
2008-03-02 Perforation 693.50 694.50 17
2008-03-02 Remedial Casing Cementing 693.50 694.50 0
2008-03-03 Perforation 588.00 589.00 17
2008-03-03 Cement Plug 552.20 615.00 0
2008-03-04 Perforation 524.00 525.00 17
2008-03-05 Remedial Casing Cementing 524.00 525.00 0
2008-03-06 Perforation 436.50 437.50 17
2008-03-07 Cement Plug 410.00 457.30 0
2008-03-08 Perforation 390.00 391.00 17
1986-10-19 Perforation 2407.00 2411.00 13
2008-03-08 Remedial Casing Cementing 390.00 391.00 0
2008-03-08 Packing Device Capped w/Cement 380.00 388.00 0
2008-03-09 Perforation 235.00 236.00 17
2008-03-09 Remedial Casing Cementing 235.00 236.00 0
2008-03-09 Packing Device Capped w/Cement 225.00 233.00 0
1986-10-19 Perforation 2405.00 2406.00 13
1986-10-19 Perforation 2401.50 2403.00 13
1986-10-19 Perforation 2399.00 2400.50 13
1986-10-19 Perforation 2397.00 2398.50 13
1986-10-20 Fracture 2397.00 2422.00 0
2003-09-10 Packing Device Capped w/Cement 2370.00 2378.00 0
2008-03-01 Packing Device Capped w/Cement 1028.00 1036.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 1440 0.0 0.0 0.0
1987 7293 0.0 0.0 0.0
1988 8250 0.0 0.0 0.0
1989 7979 0.0 0.0 0.0
1990 8497 0.0 0.0 0.0
1991 8103 0.0 0.0 0.0
1992 5427 0.0 0.0 0.0
1993 5515 0.0 0.0 0.0
1994 7698 0.0 0.0 0.0
1995 6487 0.0 0.0 0.0
1996 5016 0.0 0.0 0.0
1997 24 0.0 0.0 0.0
1999 288 0.0 0.0 0.0

For data sources see[5]

References