X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695110104000

Well Details

Well ID: 0695110104000
Loading map...
Location: 00/04-01-069-11W5/0
Location Alias: 00/04-01-69-11 W5M
Location Alias 2: 00/04-01-069-11 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 11
Section: 01
County/Municipality: Big Lakes County
Well Name: ACL SWAN HILLS IN 4-1-69-11
Operator Name: Cardinal Energy Ltd.
License Number: 0029584
License Date: 1965-12-10
License Status: Abandoned
Spud Date: 1966-01-25
Final Drill Date: 1966-02-15
Well Total Depth: 2546.60 m
Surface Hole Latitude: 54.939674
Surface Hole Longitude: -115.548979

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-12-10 Obtained License
1966-02-15 Finished Drilling
1966-02-15 Well Mode changed to Drilled and Cased
1966-02-17 Production Casing Operation Performed
1966-02-22 Perforation Treatment Performed - Bullet Perforation
1966-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-03-01 Well Began Production
1966-03-01 Well Fluid changed to Crude Oil
1966-03-01 Well Mode changed to Pumping
1967-11-22 Well Began Injection
1967-11-22 Well Fluid changed to Water
1967-11-22 Well Type changed to Injection
1986-02-04 Well Log Performed
1995-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-11-16 Plug Back Performed
1995-11-16 Well Log Performed
1995-11-18 Perforation Treatment Performed - Jet Perforation
1995-11-18 Well Log Performed
1995-11-19 Perforation Treatment Performed - Remedial Casing
1995-11-20 Well Abandoned
1995-11-20 Well Fluid changed to Water
1995-11-20 Well Mode changed to Abandoned
1995-11-20 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-02-22 Bullet Perforation 2498.10 2500.60 7
1966-02-22 Bullet Perforation 2501.80 2502.70 7
1966-02-22 Bullet Perforation 2505.80 2506.70 7
1966-02-23 Acid Treatment 2498.10 2506.70 0
1995-11-16 Packing Device Capped w/Cement 2445.00 2453.00 0
1995-11-18 Perforation 463.00 464.00 4
1995-11-19 Remedial Casing Cementing 463.00 464.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 7588 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0

For data sources see[5]

References