X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695103310000

Well Details

Well ID: 0695103310000
Loading map...
Location: 00/10-33-069-10W5/0
Location Alias: 00/10-33-69-10 W5M
Location Alias 2: 00/10-33-069-10 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 10
Section: 33
County/Municipality: Big Lakes County
Well Name: ACL CALSTAN SOBC SWANH 11-33-69-10
Operator Name: Cardinal Energy Ltd.
License Number: 0028262
License Date: 1965-05-21
License Status: Suspension
Spud Date: 1965-09-29
Final Drill Date: 1965-10-12
Well Total Depth: 2201.30 m
Surface Hole Latitude: 55.019597
Surface Hole Longitude: -115.459069

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-05-21 Obtained License
1965-10-12 Finished Drilling
1965-10-12 Well Mode changed to Drilled and Cased
1965-10-13 Production Casing Operation Performed
1965-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-10-15 Perforation Treatment Performed - Selective Bullet Perforations
1965-10-22 Well Began Production
1965-10-22 Well Fluid changed to Crude Oil
1965-10-22 Well Mode changed to Flowing
1969-02-11 Well Fluid changed to Crude Oil
1969-02-11 Well Mode changed to Pumping
2000-04-25 Perforation Treatment Performed - Bridge Plug No Cement Required
2000-04-25 Well Fluid changed to Crude Oil
2000-04-25 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-10-15 Selective Bullet Perforations 2165.30 2166.20 0
1965-10-15 Selective Bullet Perforations 2168.70 2169.60 0
1965-10-15 Selective Bullet Perforations 2170.20 2171.70 0
1965-10-15 Selective Bullet Perforations 2172.30 2174.40 0
1965-10-15 Selective Bullet Perforations 2175.10 2175.10 0
1965-10-15 Acid Treatment 2165.30 2175.10 0
2000-04-25 Bridge Plug, No Cement 2058.80 2058.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3599 0.0 0.0 0.0
1968 1488 0.0 0.0 0.0
1969 7079 0.0 0.0 0.0
1970 8399 0.0 0.0 0.0
1971 8751 0.0 0.0 0.0
1972 6179 0.0 0.0 0.0
1973 7704 0.0 0.0 0.0
1974 8686 0.0 0.0 0.0
1975 8328 0.0 0.0 0.0
1976 8508 0.0 0.0 0.0
1977 8413 0.0 0.0 0.0
1978 8612 0.0 0.0 0.0
1979 8511 0.0 0.0 0.0
1980 8308 0.0 0.0 0.0
1981 8265 0.0 0.0 0.0
1982 5922 0.0 0.0 0.0
1983 7296 0.0 0.0 0.0
1984 7723 0.0 0.0 0.0
1985 7035 0.0 0.0 0.0
1986 7264 0.0 0.0 0.0
1987 6589 0.0 0.0 0.0
1988 6821 0.0 0.0 0.0
1989 7938 0.0 0.0 0.0
1990 7578 0.0 0.0 0.0
1991 6890 0.0 0.0 0.0
1992 6851 0.0 0.0 0.0
1993 5965 0.0 0.0 0.0
1994 2834 0.0 0.0 0.0
1995 504 0.0 0.0 0.0
1996 4574 0.0 0.0 0.0
1997 8087 0.0 0.0 0.0
1998 7182 0.0 0.0 0.0
1999 6912 0.0 0.0 0.0
2000 1522 0.0 0.0 0.0

For data sources see[5]

References