If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0695103103020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.001328,"lon":-115.511091,"icon":""}]} |
Location: 02/03-31-069-10W5/0 | |
Location Alias: 02/03-31-69-10 W5M | |
Location Alias 2: 02/03-31-069-10 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 5 | |
Range: 10 | |
Section: 31 | |
County/Municipality: Big Lakes County | |
Well Name: ACL HZ 102 SWANH 3-31-69-10 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0427983 | |
License Date: 2010-12-16 | |
License Status: Issued | |
Spud Date: 2011-02-05 | |
Final Drill Date: 2011-02-21 | |
Well Total Depth: 3189.00 m | |
Surface Hole Latitude: 55.001328 | |
Surface Hole Longitude: -115.511091 |
Date | Event |
---|---|
2010-12-16 | Obtained License |
2011-02-07 | Surface Casing Operation Performed |
2011-02-12 | Direction Drilling Operation Performed - Horizontal |
2011-02-12 | Well Log Performed |
2011-02-17 | Intermediate Casing Operation Performed |
2011-02-18 | Well Log Performed |
2011-02-21 | Finished Drilling |
2011-02-21 | Well Mode changed to Drilled and Cased |
2011-02-23 | Liner Casing Operation Performed |
2011-02-23 | Perforation Treatment Performed - Open-Hole Completion |
2011-02-24 | Rig Released |
2011-03-20 | Well Log Performed |
2011-03-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-03-30 | Well Began Production |
2011-03-30 | Well Fluid changed to Crude Oil |
2011-03-30 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-02-12 | 1897.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-23 | Open Hole/Barefoot Completion | 3185.00 | 3189.00 | 0 |
2011-03-28 | Multi-Stage Fracture | 2461.70 | 2461.80 | 0 |
2011-03-28 | Multi-Stage Fracture | 2545.50 | 2545.60 | 0 |
2011-03-28 | Multi-Stage Fracture | 2655.80 | 2655.90 | 0 |
2011-03-28 | Multi-Stage Fracture | 2738.30 | 2738.40 | 0 |
2011-03-28 | Multi-Stage Fracture | 2863.50 | 2863.60 | 0 |
2011-03-28 | Multi-Stage Fracture | 2932.90 | 2933.00 | 0 |
2011-03-28 | Multi-Stage Fracture | 3072.20 | 3072.30 | 0 |
2011-03-28 | Multi-Stage Fracture | 3175.70 | 3175.80 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 5171 | 0.0 | 0.0 | 0.0 |
2012 | 8462 | 0.0 | 0.0 | 0.0 |
2013 | 8671 | 0.0 | 0.0 | 0.0 |
2014 | 8366 | 0.0 | 0.0 | 0.0 |
2015 | 8404 | 0.0 | 0.0 | 0.0 |
2016 | 7507 | 0.0 | 0.0 | 0.0 |
2017 | 7904 | 0.0 | 0.0 | 0.0 |
2018 | 8181 | 0.0 | 0.0 | 0.0 |
2019 | 8142 | 0.0 | 0.0 | 0.0 |
2020 | 2112 | 0.0 | 0.0 | 0.0 |
For data sources see[6]