X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695103102000

Well Details

Well ID: 0695103102000
Loading map...
Location: 00/02-31-069-10W5/0
Location Alias: 00/02-31-69-10 W5M
Location Alias 2: 00/02-31-069-10 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 10
Section: 31
County/Municipality: Big Lakes County
Well Name: ACL SWANH 2-31-69-10
Operator Name: Cardinal Energy Ltd.
License Number: 0029299
License Date: 1965-11-02
License Status: Abandoned
Spud Date: 1965-11-14
Final Drill Date: 1965-11-29
Well Total Depth: 2281.40 m
Surface Hole Latitude: 55.012758
Surface Hole Longitude: -115.510102

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-11-02 Obtained License
1965-11-29 Finished Drilling
1965-11-29 Well Mode changed to Drilled and Cased
1965-11-30 Production Casing Operation Performed
1965-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-12-02 Perforation Treatment Performed - Jet Perforation
1965-12-02 Perforation Treatment Performed - Selective Jet Perforations
1965-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-12-07 Well Began Production
1965-12-07 Well Fluid changed to Crude Oil
1965-12-07 Well Mode changed to Flowing
1973-08-09 Well Fluid changed to Crude Oil
1973-08-09 Well Mode changed to Pumping
1978-03-15 Perforation Treatment Performed - Jet Perforation
1978-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-16 Well Fluid changed to Crude Oil
1990-02-16 Well Mode changed to Suspended
2012-05-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-05-11 Perforation Treatment Performed - Jet Perforation
2012-05-11 Plug Back Performed
2012-05-11 Well Fluid changed to Crude Oil
2012-05-11 Well Mode changed to Abandoned Zone
2012-05-13 Perforation Treatment Performed - Cement Plug
2012-05-14 Perforation Treatment Performed - Cement Plug
2012-05-15 Perforation Treatment Performed - Jet Perforation
2012-05-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-05-16 Perforation Treatment Performed - Jet Perforation
2012-05-16 Perforation Treatment Performed - Remedial Casing
2012-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-05-17 Perforation Treatment Performed - Jet Perforation
2012-05-17 Perforation Treatment Performed - Remedial Casing
2012-05-18 Perforation Treatment Performed - Cement Plug
2012-05-18 Perforation Treatment Performed - Jet Perforation
2012-05-19 Perforation Treatment Performed - Cement Plug
2012-05-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-05-21 Perforation Treatment Performed - Jet Perforation
2012-05-21 Perforation Treatment Performed - Remedial Casing
2012-05-29 Well Abandoned
2012-05-29 Well Fluid changed to Crude Oil
2012-05-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-12-02 Perforation 2241.80 2245.20 3
1978-03-15 Perforation 2251.90 2256.70 7
1978-03-16 Acid Treatment 2241.80 2256.70 0
2012-05-11 Packing Device Capped w/Cement 2188.00 2196.00 0
2012-05-11 Perforation 1113.90 1114.90 20
2012-05-11 Perforation 1119.80 1120.80 20
2012-05-11 Perforation 849.10 850.10 20
2012-05-13 Cement Plug 952.40 1800.00 0
2012-05-14 Cement Plug 725.10 952.40 0
2012-05-15 Perforation 643.40 644.40 20
2012-05-16 Remedial Casing Cementing 643.40 644.40 0
1965-12-02 Perforation 2246.10 2247.00 3
2012-05-16 Packing Device Capped w/Cement 630.50 638.50 0
2012-05-16 Perforation 540.30 541.30 20
2012-05-17 Packing Device Capped w/Cement 526.00 534.00 0
2012-05-17 Perforation 426.10 427.10 20
2012-05-17 Remedial Casing Cementing 426.10 427.10 0
2012-05-17 Packing Device Capped w/Cement 413.00 423.00 0
2012-05-18 Perforation 242.70 245.00 20
2012-05-18 Perforation 283.20 284.20 20
2012-05-18 Perforation 314.70 315.70 20
2012-05-18 Perforation 354.80 355.80 20
1965-12-02 Selective Jet Perforations 2248.20 2248.80 0
2012-05-18 Perforation 394.60 395.60 20
2012-05-18 Cement Plug 247.80 410.20 0
2012-05-19 Cement Plug 223.60 247.80 0
2012-05-21 Perforation 219.30 220.30 20
2012-05-21 Remedial Casing Cementing 219.30 220.30 0
2012-05-21 Packing Device Capped w/Cement 209.00 217.00 0
1965-12-02 Selective Jet Perforations 2249.10 2252.20 0
1965-12-02 Selective Jet Perforations 2253.10 2254.90 0
1965-12-02 Selective Jet Perforations 2255.80 2256.40 0
1965-12-02 Acid Treatment 2241.80 2256.40 0
1965-12-03 Acid Treatment 2241.80 2256.40 0
1978-03-15 Perforation 2247.60 2250.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 640 0.0 0.0 0.0
1968 2712 0.0 0.0 0.0
1969 6959 0.0 0.0 0.0
1970 7981 0.0 0.0 0.0
1971 8751 0.0 0.0 0.0
1972 8635 0.0 0.0 0.0
1973 7659 0.0 0.0 0.0
1974 7172 0.0 0.0 0.0
1975 7093 0.0 0.0 0.0
1976 8330 0.0 0.0 0.0
1977 8216 0.0 0.0 0.0
1978 8341 0.0 0.0 0.0
1979 7931 0.0 0.0 0.0
1980 5509 0.0 0.0 0.0
1982 6167 0.0 0.0 0.0
1983 8388 0.0 0.0 0.0
1984 8500 0.0 0.0 0.0
1985 8583 0.0 0.0 0.0
1986 8510 0.0 0.0 0.0
1987 6215 0.0 0.0 0.0
1989 4416 0.0 0.0 0.0
1990 744 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-18 No Incident Encountered 0.00 0.00
2012-05-30 No Incident Encountered 0.00 0.00

For data sources see[6]

References