X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695103012000

Well Details

Well ID: 0695103012000
Loading map...
Location: 00/12-30-069-10W5/0
Location Alias: 00/12-30-69-10 W5M
Location Alias 2: 00/12-30-069-10 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 10
Section: 30
County/Municipality: Big Lakes County
Well Name: ACL SWANH 12-30-69-10
Operator Name: Cardinal Energy Ltd.
License Number: 0030031
License Date: 1966-02-16
License Status: Abandoned
Spud Date: 1966-03-03
Final Drill Date: 1966-03-23
Well Total Depth: 2274.70 m
Surface Hole Latitude: 55.005069
Surface Hole Longitude: -115.523403

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-02-16 Obtained License
1966-03-19 Production Casing Operation Performed
1966-03-23 Finished Drilling
1966-03-23 Perforation Treatment Performed - Open-Hole Completion
1966-03-23 Well Mode changed to Drilled and Cased
1966-03-24 Perforation Treatment Performed - Acid Wash - No Pressure
1966-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-04-14 Well Began Production
1966-04-14 Well Fluid changed to Crude Oil
1966-04-14 Well Mode changed to Pumping
1986-11-30 Well Fluid changed to Crude Oil
1986-11-30 Well Mode changed to Suspended
1996-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-01 Plug Back Performed
1996-03-01 Well Fluid changed to Crude Oil
1996-03-01 Well Mode changed to Abandoned Zone
1998-12-14 Perforation Treatment Performed - Jet Perforation
1998-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-12-15 Perforation Treatment Performed - Remedial Casing
1998-12-16 Well Abandoned
1998-12-16 Well Fluid changed to Crude Oil
1998-12-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-03-23 Open Hole/Barefoot Completion 2238.10 2274.70 0
1966-03-24 Acid Wash 2238.10 2274.70 0
1966-03-25 Acid Treatment 2238.10 2274.70 0
1996-03-01 Packing Device Capped w/Cement 2217.00 2225.00 0
1998-12-14 Perforation 266.50 270.00 13
1998-12-15 Remedial Casing Cementing 266.50 270.00 0
1998-12-15 Packing Device Capped w/Cement 214.50 251.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 520 0.0 0.0 0.0
1968 432 0.0 0.0 0.0
1974 416 0.0 0.0 0.0
1980 1780 0.0 0.0 0.0
1982 2207 0.0 0.0 0.0
1986 2904 0.0 0.0 0.0

For data sources see[5]

References