If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0695102609000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.012386,"lon":-115.408713,"icon":""}]} |
Location: 00/09-26-069-10W5/0 | |
Location Alias: 00/09-26-69-10 W5M | |
Location Alias 2: 00/09-26-069-10 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 5 | |
Range: 10 | |
Section: 26 | |
County/Municipality: Big Lakes County | |
Well Name: ACL SWANH 9-26-69-10 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0432518 | |
License Date: 2011-03-22 | |
License Status: Issued | |
Spud Date: 2011-06-19 | |
Final Drill Date: 2011-07-07 | |
Well Total Depth: 3065.00 m | |
Surface Hole Latitude: 55.012386 | |
Surface Hole Longitude: -115.408713 |
Date | Event |
---|---|
2011-03-22 | Obtained License |
2011-06-21 | Surface Casing Operation Performed |
2011-06-28 | Well Log Performed |
2011-06-29 | Direction Drilling Operation Performed - Horizontal |
2011-07-03 | Well Log Performed |
2011-07-04 | Intermediate Casing Operation Performed |
2011-07-05 | Well Log Performed |
2011-07-07 | Finished Drilling |
2011-07-07 | Well Log Performed |
2011-07-07 | Well Mode changed to Drilled and Cased |
2011-07-22 | Liner Casing Operation Performed |
2011-07-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-07-22 | Perforation Treatment Performed - Open-Hole Completion |
2011-07-23 | Rig Released |
2011-07-30 | Well Log Performed |
2011-08-09 | Well Began Production |
2011-08-09 | Well Fluid changed to Crude Oil |
2011-08-09 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-06-29 | 1895.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-07-22 | Open Hole/Barefoot Completion | 3062.00 | 3065.00 | 0 |
2011-07-22 | Multi-Stage Fracture | 2624.70 | 2624.80 | 0 |
2011-07-22 | Multi-Stage Fracture | 2639.20 | 2639.30 | 0 |
2011-07-22 | Multi-Stage Fracture | 2653.30 | 2653.40 | 0 |
2011-07-22 | Multi-Stage Fracture | 2666.90 | 2667.00 | 0 |
2011-07-22 | Multi-Stage Fracture | 2691.70 | 2691.80 | 0 |
2011-07-22 | Multi-Stage Fracture | 2706.20 | 2706.30 | 0 |
2011-07-22 | Multi-Stage Fracture | 2719.50 | 2719.60 | 0 |
2011-07-22 | Multi-Stage Fracture | 2733.10 | 2733.20 | 0 |
2011-07-22 | Multi-Stage Fracture | 2770.70 | 2770.80 | 0 |
2011-07-22 | Multi-Stage Fracture | 2784.30 | 2784.40 | 0 |
2011-07-22 | Multi-Stage Fracture | 2461.80 | 2461.90 | 0 |
2011-07-22 | Multi-Stage Fracture | 2797.70 | 2797.80 | 0 |
2011-07-22 | Multi-Stage Fracture | 2811.20 | 2811.30 | 0 |
2011-07-22 | Multi-Stage Fracture | 2862.50 | 2862.60 | 0 |
2011-07-22 | Multi-Stage Fracture | 2876.00 | 2876.10 | 0 |
2011-07-22 | Multi-Stage Fracture | 2904.40 | 2904.50 | 0 |
2011-07-22 | Multi-Stage Fracture | 2917.80 | 2917.90 | 0 |
2011-07-22 | Multi-Stage Fracture | 2956.60 | 2956.70 | 0 |
2011-07-22 | Multi-Stage Fracture | 2971.20 | 2971.30 | 0 |
2011-07-22 | Multi-Stage Fracture | 2985.70 | 2985.80 | 0 |
2011-07-22 | Multi-Stage Fracture | 2997.20 | 2997.30 | 0 |
2011-07-22 | Multi-Stage Fracture | 2475.60 | 2475.70 | 0 |
2011-07-22 | Multi-Stage Fracture | 2505.50 | 2505.60 | 0 |
2011-07-22 | Multi-Stage Fracture | 2516.30 | 2516.40 | 0 |
2011-07-22 | Multi-Stage Fracture | 2556.20 | 2556.30 | 0 |
2011-07-22 | Multi-Stage Fracture | 2570.80 | 2570.90 | 0 |
2011-07-22 | Multi-Stage Fracture | 2585.40 | 2585.50 | 0 |
2011-07-22 | Multi-Stage Fracture | 2599.40 | 2599.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 3055 | 0.0 | 0.0 | 0.0 |
2012 | 8722 | 0.0 | 0.0 | 0.0 |
2013 | 8664 | 0.0 | 0.0 | 0.0 |
2014 | 8133 | 0.0 | 0.0 | 0.0 |
2015 | 8603 | 0.0 | 0.0 | 0.0 |
2016 | 8775 | 0.0 | 0.0 | 0.0 |
2017 | 8734 | 0.0 | 0.0 | 0.0 |
2018 | 8388 | 0.0 | 0.0 | 0.0 |
2019 | 8325 | 0.0 | 0.0 | 0.0 |
2020 | 2170 | 0.0 | 0.0 | 0.0 |
For data sources see[6]