If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0695100704000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.954121,"lon":-115.523431,"icon":""}]} |
| Location: 00/04-07-069-10W5/0 | |
| Location Alias: 00/04-07-69-10 W5M | |
| Location Alias 2: 00/04-07-069-10 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 069 | |
| Meridian: 5 | |
| Range: 10 | |
| Section: 07 | |
| County/Municipality: Big Lakes County | |
| Well Name: Aquisition Oil SWANH 4-7-69-10 | |
| Operator Name: Acquisition Oil Corp. | |
| License Number: 0017796 | |
| License Date: 1959-09-22 | |
| License Status: Abandoned | |
| Spud Date: 1959-09-26 | |
| Final Drill Date: 1959-11-07 | |
| Well Total Depth: 2428.00 m | |
| Surface Hole Latitude: 54.954121 | |
| Surface Hole Longitude: -115.523431 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1959-09-22 | Obtained License |
| 1959-10-02 | Drill Stem Test Performed |
| 1959-11-07 | Finished Drilling |
| 1959-11-07 | Well Mode changed to Drilled and Cased |
| 1959-11-09 | Production Casing Operation Performed |
| 1960-01-04 | Perforation Treatment Performed - Jet Perforation |
| 1960-01-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1960-01-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1960-01-14 | Perforation Treatment Performed - Bullet Perforation |
| 1960-12-01 | Well Began Production |
| 1960-12-01 | Well Fluid changed to Crude Oil |
| 1960-12-01 | Well Mode changed to Pumping |
| 1979-10-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1998-06-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-06-09 | Perforation Treatment Performed - Jet Perforation |
| 1998-06-09 | Plug Back Performed |
| 1998-06-10 | Perforation Treatment Performed - Cement Plug |
| 1998-06-10 | Perforation Treatment Performed - Remedial Casing |
| 1998-06-11 | Well Abandoned |
| 1998-06-11 | Well Fluid changed to Crude Oil |
| 1998-06-11 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1960-01-04 | Perforation | 2388.40 | 2395.70 | 7 |
| 1960-01-14 | Bullet Perforation | 2404.60 | 2410.40 | 13 |
| 1960-01-14 | Bullet Perforation | 2415.20 | 2416.80 | 13 |
| 1960-01-14 | Bullet Perforation | 2396.60 | 2397.90 | 13 |
| 1960-01-14 | Bullet Perforation | 2399.40 | 2400.60 | 13 |
| 1960-01-14 | Bullet Perforation | 2401.80 | 2403.00 | 13 |
| 1960-01-14 | Bullet Perforation | 2412.20 | 2412.80 | 13 |
| 1960-01-14 | Acid Treatment | 2387.80 | 2417.70 | 0 |
| 1979-10-22 | Acid Treatment | 2387.80 | 2417.70 | 0 |
| 1998-06-09 | Packing Device Capped w/Cement | 2369.00 | 2377.00 | 0 |
| 1998-06-09 | Perforation | 559.00 | 560.00 | 7 |
| 1960-01-04 | Perforation | 2398.20 | 2402.40 | 7 |
| 1998-06-10 | Remedial Casing Cementing | 559.00 | 560.00 | 0 |
| 1998-06-10 | Cement Plug | 536.00 | 560.00 | 0 |
| 1960-01-04 | Perforation | 2406.10 | 2408.50 | 7 |
| 1960-01-04 | Perforation | 2412.20 | 2413.40 | 7 |
| 1960-01-04 | Perforation | 2414.90 | 2417.70 | 7 |
| 1960-01-09 | Acid Treatment | 2388.40 | 2417.70 | 0 |
| 1960-01-14 | Bullet Perforation | 2387.80 | 2390.20 | 13 |
| 1960-01-14 | Bullet Perforation | 2391.50 | 2392.10 | 13 |
| 1960-01-14 | Bullet Perforation | 2393.30 | 2395.10 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1979 | 2938 | 0.0 | 0.0 | 0.0 |
For data sources see[5]