X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695100502000

Well Details

Well ID: 0695100502000
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Location: 00/02-05-069-10W5/0
Location Alias: 00/02-05-69-10 W5M
Location Alias 2: 00/02-05-069-10 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 10
Section: 05
County/Municipality: Big Lakes County
Well Name: Aquisition Oil SWANH 2-5-69-10
Operator Name: Acquisition Oil Corp.
License Number: 0025914
License Date: 1964-03-20
License Status: Abandoned
Spud Date: 1964-03-26
Final Drill Date: 1964-04-12
Well Total Depth: 2516.10 m
Surface Hole Latitude: 54.939686
Surface Hole Longitude: -115.485452

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-03-20 Obtained License
1964-04-12 Finished Drilling
1964-04-12 Well Mode changed to Drilled and Cased
1964-04-13 Production Casing Operation Performed
1964-04-17 Perforation Treatment Performed - Bullet Perforation
1964-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-04-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-04-24 Well Began Production
1964-04-24 Well Fluid changed to Crude Oil
1964-04-24 Well Mode changed to Flowing
1964-05-10 Well Fluid changed to Crude Oil
1964-05-10 Well Mode changed to Pumping
2000-03-28 Well Fluid changed to Crude Oil
2000-03-28 Well Mode changed to Suspended
2006-11-23 Well Log Performed
2015-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-07-29 Plug Back Performed
2015-07-29 Well Fluid changed to Crude Oil
2015-07-29 Well Log Performed
2015-07-29 Well Mode changed to Abandoned Zone
2015-10-19 Well Abandoned
2015-10-19 Well Fluid changed to Crude Oil
2015-10-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-04-17 Bullet Perforation 2455.20 2457.00 3
1964-04-17 Bullet Perforation 2459.10 2461.30 3
1964-04-17 Bullet Perforation 2464.30 2466.70 3
1964-04-17 Bullet Perforation 2471.00 2473.80 3
1964-04-17 Bullet Perforation 2475.30 2476.80 3
1964-04-18 Acid Treatment 2455.20 2476.80 0
1964-04-21 Acid Treatment 2455.20 2476.80 0
2015-07-29 Packing Device Capped w/Cement 2435.00 2443.00 0
2015-07-29 Packing Device Capped w/Cement 352.00 360.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8550 0.0 0.0 0.0
1968 6525 0.0 0.0 0.0
1969 5869 0.0 0.0 0.0
1970 8694 0.0 0.0 0.0
1971 8529 0.0 0.0 0.0
1972 8465 0.0 0.0 0.0
1973 8727 0.0 0.0 0.0
1974 8376 0.0 0.0 0.0
1975 8542 0.0 0.0 0.0
1976 8043 0.0 0.0 0.0
1977 8107 0.0 0.0 0.0
1978 8506 0.0 0.0 0.0
1979 8624 0.0 0.0 0.0
1980 8233 0.0 0.0 0.0
1981 8162 0.0 0.0 0.0
1982 8085 0.0 0.0 0.0
1983 8696 0.0 0.0 0.0
1984 8554 0.0 0.0 0.0
1985 8322 0.0 0.0 0.0
1986 7979 0.0 0.0 0.0
1987 6238 0.0 0.0 0.0
1988 3096 0.0 0.0 0.0
1989 4012 0.0 0.0 0.0
1990 5637 0.0 0.0 0.0
1991 5582 0.0 0.0 0.0
1992 8427 0.0 0.0 0.0
1993 5085 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-07-30 No Incident Encountered 0.00 0.00

For data sources see[6]

References

BESbswy