X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695093202000

Well Details

Well ID: 0695093202000
Loading map...
Location: 00/02-32-069-09W5/0
Location Alias: 00/02-32-69-09 W5M
Location Alias 2: 00/02-32-069-09 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 09
Section: 32
County/Municipality: Big Lakes County
Well Name: ACL ET AL HOUSE MT HZ RE 8-32-69-9
Operator Name: Cardinal Energy Ltd.
License Number: 0026980
License Date: 1964-10-15
License Status: Amended
Spud Date: 1964-11-03
Final Drill Date: 1964-11-18
Well Total Depth: 2167.10 m
Surface Hole Latitude: 55.011909
Surface Hole Longitude: -115.333664

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-10-15 Obtained License
1964-11-18 Finished Drilling
1964-11-18 Well Mode changed to Drilled and Cased
1964-11-19 Production Casing Operation Performed
1964-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-11-21 Perforation Treatment Performed - Bullet Perforation
1964-11-24 Well Began Production
1964-11-24 Well Fluid changed to Crude Oil
1964-11-24 Well Mode changed to Flowing
1964-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-08-09 Well Fluid changed to Crude Oil
1973-08-09 Well Mode changed to Pumping
1994-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-25 Plug Back Performed
1994-08-25 Well Fluid changed to Crude Oil
1994-08-25 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-11-21 Bullet Perforation 2127.50 2132.40 7
1964-11-21 Bullet Perforation 2134.20 2134.50 7
1964-11-21 Bullet Perforation 2137.00 2138.50 7
1964-11-21 Bullet Perforation 2140.30 2140.90 7
1964-11-21 Acid Treatment 2127.50 2140.90 0
1964-12-05 Acid Treatment 2127.50 2140.90 0
1994-08-25 Packing Device Capped w/Cement 2102.00 2110.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 600 0.0 0.0 0.0
1968 72 0.0 0.0 0.0
1969 576 0.0 0.0 0.0
1970 8424 0.0 0.0 0.0
1971 7504 0.0 0.0 0.0
1972 7074 0.0 0.0 0.0
1973 8632 0.0 0.0 0.0
1974 7952 0.0 0.0 0.0
1975 7711 0.0 0.0 0.0
1976 8454 0.0 0.0 0.0
1977 8704 0.0 0.0 0.0
1978 7938 0.0 0.0 0.0
1979 8237 0.0 0.0 0.0
1980 8667 0.0 0.0 0.0
1981 6971 0.0 0.0 0.0
1982 7938 0.0 0.0 0.0
1983 8496 0.0 0.0 0.0
1984 8474 0.0 0.0 0.0
1985 8653 0.0 0.0 0.0
1986 8590 0.0 0.0 0.0
1987 8482 0.0 0.0 0.0
1988 8116 0.0 0.0 0.0
1989 8450 0.0 0.0 0.0
1990 8131 0.0 0.0 0.0
1991 7751 0.0 0.0 0.0
1992 8048 0.0 0.0 0.0
1993 7891 0.0 0.0 0.0
1994 4786 0.0 0.0 0.0

For data sources see[5]

References