X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695092310000

Well Details

Well ID: 0695092310000
Loading map...
Location: 00/10-23-069-09W5/0
Location Alias: 00/10-23-69-09 W5M
Location Alias 2: 00/10-23-069-09 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 09
Section: 23
County/Municipality: Big Lakes County
Well Name: PAN AM A-1 DEERMT 16-23-69-9
Operator Name: Cardinal Energy Ltd.
License Number: 0023551
License Date: 1962-12-20
License Status: Amended
Spud Date: 1962-12-24
Final Drill Date: 1963-01-12
Well Total Depth: 2159.50 m
Surface Hole Latitude: 54.990551
Surface Hole Longitude: -115.256027

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-12-20 Obtained License
1963-01-12 Finished Drilling
1963-01-12 Well Mode changed to Drilled and Cased
1963-01-14 Production Casing Operation Performed
1963-02-04 Perforation Treatment Performed - Jet Perforation
1963-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-02-07 Well Began Production
1963-02-07 Well Fluid changed to Crude Oil
1963-02-07 Well Mode changed to Flowing
1963-03-20 Well Fluid changed to Crude Oil
1963-03-20 Well Mode changed to Pumping
1993-02-26 Well Log Performed
1993-03-01 Well Log Performed
1993-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-06-03 Plug Back Performed
1993-06-13 Well Fluid changed to Crude Oil
1993-06-13 Well Mode changed to Abandoned and Whipstocked
1993-07-19 Well Log Performed
1993-07-26 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-02-04 Perforation 2106.80 2109.20 7
1963-02-04 Perforation 2111.00 2112.30 7
1963-02-04 Perforation 2115.60 2117.10 7
1963-02-04 Perforation 2119.30 2119.90 7
1963-02-04 Perforation 2126.60 2127.20 7
1963-02-04 Perforation 2129.60 2130.60 7
1963-02-05 Acid Treatment 2106.80 2130.60 0
1993-06-03 Packing Device Capped w/Cement 2092.00 2100.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1404 0.0 0.0 0.0
1968 1608 0.0 0.0 0.0
1969 7871 0.0 0.0 0.0
1970 7591 0.0 0.0 0.0
1971 8175 0.0 0.0 0.0
1972 8614 0.0 0.0 0.0
1973 8528 0.0 0.0 0.0
1974 6954 0.0 0.0 0.0
1975 6703 0.0 0.0 0.0
1976 8468 0.0 0.0 0.0
1977 8507 0.0 0.0 0.0
1978 991 0.0 0.0 0.0
1979 5207 0.0 0.0 0.0
1980 8589 0.0 0.0 0.0
1981 3994 0.0 0.0 0.0
1982 8498 0.0 0.0 0.0
1983 7992 0.0 0.0 0.0
1984 8731 0.0 0.0 0.0
1985 8675 0.0 0.0 0.0
1986 8754 0.0 0.0 0.0
1987 8648 0.0 0.0 0.0
1988 8315 0.0 0.0 0.0
1989 8687 0.0 0.0 0.0
1990 8636 0.0 0.0 0.0
1991 8642 0.0 0.0 0.0
1992 7947 0.0 0.0 0.0
1993 1192 0.0 0.0 0.0

For data sources see[5]

References