X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695092102000

Well Details

Well ID: 0695092102000
Loading map...
Location: 00/02-21-069-09W5/0
Location Alias: 00/02-21-69-09 W5M
Location Alias 2: 00/02-21-069-09 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 09
Section: 21
County/Municipality: Big Lakes County
Well Name: ACL ET AL SWANH 2-21-69-9
Operator Name: Cardinal Energy Ltd.
License Number: 0027273
License Date: 1964-12-02
License Status: Abandoned
Spud Date: 1964-12-06
Final Drill Date: 1964-12-22
Well Total Depth: 2115.30 m
Surface Hole Latitude: 54.983075
Surface Hole Longitude: -115.307817

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-12-02 Obtained License
1964-12-15 Lost Circulation Occurred
1964-12-22 Drill Stem Test Performed
1964-12-22 Finished Drilling
1964-12-22 Well Mode changed to Drilled and Cased
1964-12-24 Perforation Treatment Performed - Open-Hole Completion
1964-12-24 Production Casing Operation Performed
1965-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-02-07 Well Began Production
1965-02-07 Well Fluid changed to Crude Oil
1965-02-07 Well Mode changed to Pumping
1969-01-07 Well Fluid changed to Crude Oil
1969-01-07 Well Mode changed to Suspended
1996-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-03-13 Perforation Treatment Performed - Open-Hole Completion
2004-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-03-14 Plug Back Performed
2004-03-14 Well Fluid changed to Crude Oil
2004-03-14 Well Log Performed
2004-03-14 Well Mode changed to Abandoned Zone
2004-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-03-15 Perforation Treatment Performed - Jet Perforation
2004-03-15 Well Log Performed
2004-03-18 Well Abandoned
2004-03-18 Well Fluid changed to Crude Oil
2004-03-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-12-24 Open Hole/Barefoot Completion 2081.80 2115.30 0
1965-01-06 Acid Treatment 2081.80 2115.30 0
1965-01-09 Acid Treatment 2081.80 2115.30 0
1965-01-15 Acid Treatment 2081.80 2115.30 0
1996-03-17 Packing Device Capped w/Cement 1989.40 1999.40 0
2004-03-13 Open Hole/Barefoot Completion 2081.80 2115.30 0
2004-03-14 Packing Device Capped w/Cement 2064.00 2072.00 0
2004-03-15 Perforation 306.50 307.00 17
2004-03-15 Packing Device Capped w/Cement 180.00 322.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1964-12-15 Lost Circulation 1666.90 1666.90

For data sources see[6]

References