X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695092015020

Well Details

Well ID: 0695092015020
Loading map...
Location: 02/15-20-069-09W5/0
Location Alias: 02/15-20-69-09 W5M
Location Alias 2: 02/15-20-069-09 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 09
Section: 20
County/Municipality: Big Lakes County
Well Name: ACL 102 SWANH 15-20-69-9
Operator Name: Cardinal Energy Ltd.
License Number: 0415526
License Date: 2009-12-14
License Status: Suspension
Spud Date: 2010-01-03
Final Drill Date: 2010-01-20
Well Total Depth: 2743.00 m
Surface Hole Latitude: 54.989635
Surface Hole Longitude: -115.329967

For data sources see[1][2]

Well History

Date Event
2009-12-14 Obtained License
2010-01-05 Surface Casing Operation Performed
2010-01-11 Direction Drilling Operation Performed - Horizontal
2010-01-17 Production Casing Operation Performed
2010-01-20 Finished Drilling
2010-01-20 Perforation Treatment Performed - Open-Hole Completion
2010-01-20 Well Log Performed
2010-01-20 Well Mode changed to Drilled and Cased
2010-01-22 Well Log Performed
2010-01-23 Rig Released
2010-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-20 Well Began Production
2010-02-20 Well Fluid changed to Crude Oil
2010-02-20 Well Mode changed to Pumping
2010-08-14 Well Log Performed
2010-08-22 Liner Casing Operation Performed
2010-08-22 Perforation Treatment Performed - Open-Hole Completion
2010-08-26 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-01 Well Fluid changed to Crude Oil
2017-10-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-01-11 1805.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-01-20 Open Hole/Barefoot Completion 2342.00 2743.00 0
2010-08-26 Multi-Stage Fracture 2499.20 2499.30 0
2010-08-26 Multi-Stage Fracture 2511.50 2511.60 0
2010-08-26 Multi-Stage Fracture 2548.60 2548.70 0
2010-08-26 Multi-Stage Fracture 2566.30 2566.40 0
2010-08-26 Multi-Stage Fracture 2590.70 2590.80 0
2010-08-26 Multi-Stage Fracture 2614.90 2615.00 0
2010-08-26 Multi-Stage Fracture 2690.00 2690.10 0
2010-02-09 Acid Treatment 2342.00 2743.00 0
2010-08-22 Open Hole/Barefoot Completion 2735.10 2743.00 0
2010-08-26 Multi-Stage Fracture 2393.00 2393.10 0
2010-08-26 Multi-Stage Fracture 2409.70 2409.80 0
2010-08-26 Multi-Stage Fracture 2425.30 2425.40 0
2010-08-26 Multi-Stage Fracture 2439.30 2439.40 0
2010-08-26 Multi-Stage Fracture 2474.60 2474.70 0
2010-08-26 Multi-Stage Fracture 2486.90 2487.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6874 0.0 0.0 0.0
2011 8186 0.0 0.0 0.0
2012 8667 0.0 0.0 0.0
2013 7583 0.0 0.0 0.0
2014 8248 0.0 0.0 0.0
2015 7165 0.0 0.0 0.0
2016 480 0.0 0.0 0.0

For data sources see[6]

References