If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0694151711000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.973818,"lon":-112.258683,"icon":""}]} |
Location: 00/11-17-069-15W4/0 | |
Location Alias: 00/11-17-69-15 W4M | |
Location Alias 2: 00/11-17-069-15 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 4 | |
Range: 15 | |
Section: 17 | |
County/Municipality: Lac La Biche County | |
Well Name: MNK CHARRON 11-17-69-15 | |
Operator Name: Manitok Energy Inc. | |
License Number: 0063129 | |
License Date: 1977-03-08 | |
License Status: Suspension | |
Spud Date: 1977-03-10 | |
Final Drill Date: 1977-03-18 | |
Well Total Depth: 469.40 m | |
Surface Hole Latitude: 54.973818 | |
Surface Hole Longitude: -112.258683 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1977-03-08 | Obtained License |
1977-03-13 | Kick Occurred |
1977-03-15 | Drill Stem Test Performed |
1977-03-15 | Well Log Performed |
1977-03-16 | Drill Stem Test Performed |
1977-03-17 | Production Casing Operation Performed |
1977-03-18 | Finished Drilling |
1977-03-18 | Perforation Treatment Performed - Open-Hole Completion |
1977-03-19 | Drill Stem Test Performed |
1977-03-24 | Well Mode changed to Drilled and Cased |
1977-12-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1977-12-15 | Perforation Treatment Performed - Bullet Perforation |
1977-12-15 | Well Mode changed to Abandoned Zone |
1977-12-16 | Perforation Treatment Performed - Bullet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1977-03-18 | Open Hole/Barefoot Completion | 462.10 | 469.40 | 0 |
1977-12-15 | Packing Device Capped w/Cement | 441.00 | 448.10 | 0 |
1977-12-15 | Bullet Perforation | 319.70 | 321.30 | 13 |
1977-12-16 | Bullet Perforation | 228.30 | 229.80 | 26 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1977-03-13 | Kick | 347.50 | 347.50 |
For data sources see[5]