X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0694020706003

Well Details

Well ID: 0694020706003
Loading map...
Location: 00/06-07-069-02W4/3
Location Alias: 00/06-07-69-02 W4M
Location Alias 2: 00/06-07-069-02 W4/03
Country: Canada
Province: Alberta
Township: 069
Meridian: 4
Range: 02
Section: 07
County/Municipality: Improvement District No. 349
Well Name: CVE FISHER 6-7-69-2
Operator Name: Cenovus Energy Inc.
License Number: 0133012
License Date: 1988-03-09
License Status: Suspension
Spud Date: 1988-03-09
Final Drill Date: 1988-03-12
Well Total Depth: 625.00 m
Surface Hole Latitude: 54.955492
Surface Hole Longitude: -110.302080

For data sources see[1][2]

Well History

Date Event
1988-03-09 Obtained License
1988-03-10 Surface Casing Operation Performed
1988-03-12 Finished Drilling
1988-03-12 Well Log Performed
1988-03-12 Well Mode changed to Drilled and Cased
1988-03-13 Production Casing Operation Performed
1988-03-13 Rig Released
1997-12-10 Perforation Treatment Performed - Jet Perforation
1997-12-10 Well Log Performed
1997-12-11 Perforation Treatment Performed - Jet Perforation
1997-12-11 Well Log Performed
2002-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-02 Plug Back Performed
2002-03-03 Well Log Performed
2002-03-09 Perforation Treatment Performed - Jet Perforation
2002-03-09 Well Log Performed
2002-03-18 Well Began Production
2002-03-18 Well Fluid changed to Gas
2002-03-18 Well Mode changed to Flowing
2005-02-20 Well Log Performed
2006-07-01 Well Fluid changed to Gas
2006-07-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-12-10 Perforation 528.00 530.50 14
1997-12-11 Perforation 380.50 381.50 13
2002-03-02 Packing Device Capped w/Cement 507.00 515.00 0
2002-03-09 Perforation 404.00 405.00 20
2002-03-09 Perforation 497.50 498.50 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 5224 0.0 0.0 0.0
2003 2583 0.0 0.0 0.0
2004 2190 0.0 0.0 0.0
2005 30 0.0 0.0 0.0

For data sources see[5]

References